BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 16, 2025 at 8:00 PM

Updated April 17, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Poplar Point, Manitoba. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Reference Number 0000289993 Question Acceptance Deadline 2025/04/11 01:00:00 PM EDT Demolition and removal of the existing timber bridge and the construction of a single span precast box girder bridge structure and associated road works over Willowbend Creek on Provincial Road 227, 2.8 km E of Provincial Trunk Highway 16 SEC NW 16-13-08W, in the Municipality of Portage La Prairie, Bridge Site No. 0154-00. Completion Model The Contract Will Be Assessed Liquidated Damages in Accordance With the Specification for Liquidated Damages - Completion Specified by Completion Date. Completion Dates and Liquidated Damages Must Be Completed No Later Than October 30, 2025. Daily Liquidated Damages After This Specified Final Completion Date Will Be Charged to the Contractor at the Rate of Two Thousand ($2,000.00) Dollars Per Calendar Day Until the Work is Completed. Seasonal Shutdown Date The Seasonal Shutdown Date for Applicable Roadwork is October 31 of Any Given Year. The Seasonal Shutdown Date for Applicable in-stream Work is April 1 - June 15 of Any Given Year Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. Award is subject to final approval

Award

Bridges / Tunnels

$3,884,821.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

47

6

4

2

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
34
Bidding Soon
497
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2025

June 16, 2025

Project location map

MB-227, Poplar Point, MB

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.