Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 29, 2026 at 8:00 PM
Updated August 1, 2026
Renovation of a military facility in Avon Park, Florida. Completed plans call for the renovation of a military facility; and military facility.
Provide all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary to repair the fire protection and detection systems and the hangar door for Building 632. Work includes removal of existing AFFF tanks and associated piping and installation of new water piping and pumps, as well as resizing pumps in the Base Pump House (Building 831) to provide adequate pressure to the fire water loop. Remove existing Megadoor hangar doors at the north door of Building 632, including mullion doors, motors, conduit, and wiring, and provide and install a new Megadoor vertical lift hangar door system with all associated components. The Megadoor vertical lift hangar door by ASSA ABLOY is specified for compatibility with the existing installation systems. An optional line item includes providing and installing a new generator. The period of performance is 365 calendar days after notice to proceed, including inspection and punch list completion. PROJECT MAGNITUDE: BETWEEN $5,000,000 AND $10,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 07/14/2026
GC Bidding
Military
$10,000,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 12, 2026
October 12, 2026
182 AIRLIFT WING, Avon Park, FL
Related To This Project
Avon Park, FL
Bid Date: Oct 27 2025
Avon Park, FL
--
Avon Park, FL
Bid Date: Nov 12 2025
Avon Park, FL
Bid Date: Nov 04 2025
Avon Park, FL
Bid Date: Dec 08 2025
Avon Park, FL
Bid Date: Dec 16 2025
Avon Park, FL
--
Avon Park, FL
Bid Date: Oct 14 2025
Avon Park, FL
Bid Date: Mar 16 2026
Avon Park, FL
Bid Date: Oct 29 2025
Avon Park, FL
Bid Date: Feb 26 2026
Avon Park, FL
Bid Date: Oct 07 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
