Published November 14, 2025 at 7:00 PM

Updated November 15, 2025

Site work and renovation of a medical facility in Ann Arbor, Michigan. Completed plans call for the renovation of a medical facility; and for site work for a medical facility.

Site improvements for new gate building. QUESTIONS DUE: 10/29/2025 12:00 PM EST Major aspects of the work include: a. Removing and reinstalling existing ceiling tile. b. Painting existing wall finishes damaged during the renovation. c. Install new conduits for power, security, telecommunications and data inthe CVCInterior. d. Install new conduits for power, security, telecommunications and data outsidetheCVCbldg.d. Construction of the weather barrier wall on the exterior at conduit wall penetrations. e. Construction of fire rated dust barriers in the interior for conduit installations. f. Re-install new electrical light pole, foundation and wiring in newlocation. g. Install new transformer adjacent to guard booth. h. Install new concrete sidewalks and roadway at new conduit locations. i. Install new guard booth, reinforced concrete foundation and conduits to guardbooth. j. Install new landscape at guard booth. k. Coordinate all accommodations with UM Security. l. Coordinate installation of guard booth with power, security telecommunications anddata. The project will start when all required materials are on hand or in fabrication for deliveryduringtheconstruction period. The Work consists of renovations to portions of the existing Samuel and Jean Frankel CardiovascularCenter (CVC), Level 1, Level 2 building and exterior. The purpose of the project is toprovidearchitecturaldesign, electrical and civil engineering services to install power, security, telecommunications anddatatothePavilion Loading Dock Guard Booth located at the CVC building. The power and security/ communicationrunfrom CVC Level 1 and Level 2 will need to extend to the new guard booth. The workwill includeapproximately +/-1,200 gross sq. ft. of space. Major aspects of the work include, but are not limitedto: E. The Work consists of installing power, security, telecommunications and data to the newguardbooth. Removalof ceiling tiles will be required to install the conduits above the ceiling plenumon Level 1 of theCVCbuilding.The conduits will have to travel along the corridors and exit through the existing reinforcedexterior concretewalls. The conduits will then travel under sidewalks and roadways to the location of the newguardbooth.building and cutting back a planter. Access by the Fire Department will be required andcoordinatedwiththeMM Construction Services Project Manager. All Emergency activities must be maintainedthroughconstruction activities

Post-Bid

Medical

$250,000.00

Public - State/Provincial

Renovation, Site Work

61

34

11

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
336
Active Projects
131
Bidding Soon
2,519
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 13, 2025

April 15, 2026

Project location map

1500 E Medical Center Dr, Ann Arbor, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.