BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 17, 2026 at 7:00 PM

Updated January 18, 2026

Site work for a playground / park / athletic field in Boulder City, Nevada. Completed plans call for site work for a playground / park / athletic field.

FORMAL BID NO. FB-XXXX-XX ENGINEERS ESTIMATE OF PROBABLE COST: $190,000 - $230,000 Bid Notes This work shall include furnishing all labor, material, and equipment to complete the project WILBUR SQUARE PARK IRRIGATION RENOVATION as described in the specifications and shown in the plans. Work includes replacing the existing irrigation system at Wilbur Square with a new, fully automated system to serve the park's turfgrass areas. This work shall also include but is not limited to construction of a new point-of-connection to the existing raw water distribution mainline, installation of mainline and lateral piping, booster pumping equipment, pedestal-mounted irrigation controller, rain sensor, flow valve assemblies, gate valves, valve boxes, quick coupling valves, etc. The system will utilize a conventional low-voltage wire setup with supplementary two-wire cable for future conversion. Contractor shall verify existing site conditions and provide all required fittings and connections as shown in the contract documents. The work also includes all turf repair needed due to the work. The Contractor will be allowed to close the whole park for their work operations for the duration of the contract. The Contractorshall fence the park, for their operations if the Contractor decides to close the whole park. The Contractor will be required to maintain the fencing during the work week and over the weekends. The Contractor shall be responsible for insuring any open work areas are safe from the public during non-working hours and over the weekends. Question Deadline 12/30/2025 at 12:00 PM PT *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Playgrounds / Parks / Athletic Fields

$399,971.00

Public - City

Site Work

15

11

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
29
Bidding Soon
322
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 8, 2026

February 9, 2026

Project location map

1100 Colorado St, Boulder City, NV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.