BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 12, 2025 at 7:00 PM

Updated January 6, 2026

Site work and new construction of a transportation facility in Boulder City, Nevada. Completed plans call for the construction of a 500-square-foot, nine-story above grade, one-room transportation facility.

The project is for pre-construction and construction services for a new Air Traffic Control Tower (ATCT) at the Boulder City Municipal Airport. The work will be performed under two contracts: one for Pre-Construction Services and one for Construction Services. The ATCT structure will be approximately 126 feet above ground level to the top of the tower, with a cab floor height of roughly 93 feet above ground level. The tower will consist of 9 levels, and the control cab will be about 500 square feet with provision for four air traffic controller workstations as indicated in the project plans. There are no explicit instructions to bidders included. Question Cut Off Date: 12/10/2025 02:00:00 PM (PT) Questions Submit Electronically AIP - 3-32-0003-33 Space on non-cab floors shall accommodate a staff break room, restrooms, janitorial closet, mechanical, electrical, telecommunications, ATCT’s electronics, communications and equipment. The adjoining base building (approximately 2,400 square feet) will contain Tower Managers office, controller meeting and training space, restrooms, janitor/storage closet, break room, fire pump and fire command room. In addition to the ATCT facility, this project will include a driveway, parking lot, ADA access compliance, secondary weather station, and extending utilities to the facility. Preconstruction Services shall include constructability reviews, construction cost estimates, advice, project analysis and feedback regarding materials, methods, systems, schedule, labor and other conditions affecting construction and subcontractor selection for development and construction of the Air Traffic Control Tower Project as indicated on the plans. This scope of work shall also include any additional geotechnical and subsurface investigations/utility locates/permitting beyond those performed by the design professional necessary to assist with establishing the Guaranteed Maximum Price (GMP) for the Construction Services. This scope of work may also include long lead items or early ordering of equipment for the project. The estimated Project cost is $12,000,000 - $13,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Transportation Terminals

$13,000,000.00

Public - City

New Construction, Site Work

222

7

2

2

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
31
Bidding Soon
319
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 5, 2026

September 1, 2026

Project location map

1201 Airport Rd, Boulder City, NV


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.