Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 9, 2025 at 7:00 PM
Updated December 10, 2025
Renovation of a transportation facility in Miami, Florida. Completed plans call for the renovation of a one-story above grade transportation facility.
Scope of Work shall include, but not be limited to: Provide all labor, equipment, and materials for the architectural, structural, and electrical work required for MIA Building 3094 as recommended from the 40-Year Recertification Inspection Report. Contractor shall review all documents and scope of work provided by Miami-Dade Aviation Department for work to be completed. Please refer to the plans for further description of the scope of work. Contractors must agree to perform all work in accordance with the scopes of work established by Miami-Dade Aviation Department, the contract’s terms and conditions, all required permits and inspections, and all applicable federal, state, and local laws, codes, and regulations. Any minor variation in the scope of work that is necessary to complete the intended work shall be considered incidental and will not warrant additional compensation. Any major variation encountered in the scope of work that is necessary to complete the intended work will be additional work and will be compensated through a contingency allowance account, dedicated allowance account, or change order. However, such major variation shall be completed without delay. Contractor shall use an adequate number of qualified workers who are thoroughly trained in the techniques required to properly complete the work specified. Contractor will own or have access to the equipment necessary and to meet all safety, insurance, and technical requirements of the owner and local, county, state, and federal regulating authorities. The grand total bid price shall be reflected on the bid form provided. Bidders are responsible for attending the mandatory pre-bid meeting conference call and site visit. All potential bidders are hereby notified that bids for this project must reflect a lump sum amount. The lump sum bid amount shall be all inclusive to complete the work scope reflected on the construction bid documents. Bidders are responsible for all costs related to permitting, preparation of required shop drawings, special inspections, preparation of as-built drawings, close-out documentation, and/or any engineering certificates required. Contractor must refer to the Request for Price Quotation and associated project documents for the detail Scope of Work. Errors, omissions, and/or discrepancies in quantities shall be brought up to the attention of the Miami-Dade Aviation Department team via the request for information process during the bidding phase. Failure to confirm estimated quantities shall not constitute grounds for subsequent change orders.
Post-Bid
Transportation Terminals
$1,654,056.00
Public - County
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 3, 2025
January 21, 2026
To be determined, Miami, FL
Related To This Project
Miami, FL
Bid Date: Dec 09 2025
Miami, FL
Bid Date: Nov 20 2025
Miami, FL
--
Miami, FL
Bid Date: Feb 03 2026
Miami, FL
Bid Date: Dec 03 2025
Miami, FL
Bid Date: Dec 02 2025
Miami, FL
Bid Date: Oct 30 2025
Miami, FL
--
Miami, FL
Bid Date: Jan 06 2026
Miami, FL
Bid Date: Nov 20 2025
Miami, FL
Bid Date: Nov 20 2025
Miami, FL
Bid Date: Nov 20 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
