Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 6, 2026 at 7:00 PM
Updated January 7, 2026
Site work and renovation of a civil project in Miami, Florida. Completed plans call for the renovation of a one-story above grade water / sewer project; and one-story above grade water / sewer project.
The work consists of rehabilitation of existing Plant 01 Return Sludge Pump Stations No. 1, No. 2, and No. 3 and Secondary Clarifiers Plant 01 located at the Central District Wastewater Treatment Plant (CDWWTP). The scope includes the replacement and/or repair of existing physical equipment, as well as other associated improvements such as structural, architectural, process mechanical, HVAC, electrical, and instrumentation and controls. Estimated Range of the Base Bid - $21,882,320.70 to $26,476,400.30 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. RFI Cutoff Wednesday, November 19, 2025 5:00 PM
Bid Results
Water / Sewer
$26,870,130.00
Public - County
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 6, 2026
February 9, 2026
Multiple Locations, Miami, FL
Related To This Project
Miami, FL
--
Miami, FL
Bid Date: Dec 03 2025
Miami, FL
Bid Date: Dec 09 2025
Miami, FL
Bid Date: Nov 20 2025
Miami, FL
--
Miami, FL
Bid Date: Feb 03 2026
Miami, FL
Bid Date: Nov 20 2025
Miami, FL
Bid Date: Nov 20 2025
Miami, FL
Bid Date: Nov 20 2025
Miami, FL
Bid Date: Nov 20 2025
Miami, FL
Bid Date: Nov 12 2025
Miami, FL
Bid Date: Oct 21 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
