Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 9, 2025 at 7:00 PM

Updated December 10, 2025

Renovation of an industrial development in Santa Cruz, California. Working plans call for the renovation of a one-story above grade industrial development.

**As of December 09, 2025 project has been canceled. As of this time it is unknown if when project will rebid. The scope of work includes the removal and replacement of the existing cooling tower CT-1, including the heat exchanger, pumps, strainers/filters, piping, valves, controls/instrumentation, new concrete supports, and related retrofit modifications required to achieve a fully integrated, reliable, energy efficient, and water conserving Campus Cooling Water System. All equipment is to be located on outdoor concrete pads, with no conditioned enclosures required. Provisions are being provided for a temporary condenser water supply and return bypass system to facilitate keeping cooling tower 3 (CT-3) functional during the demolition and construction of cooling tower 1 (CT-1). Bidders must attend a mandatory Pre-Bid Conference and Job Walk in its entirety to be eligible to submit a bid. Sealed bids are to be received electronically via the designated plan room website. Bidders may be required to submit qualifications with their bids. The successful bidder must have a current and active California contractor's license (A General Engineering Contractor or B General Building Contractor). Bidders and their subcontractors must comply with nondiscrimination requirements and prevailing wage laws. No contractor or subcontractor may participate unless registered with the Department of Industrial Relations. The successful bidder must pay no less than the UC Fair Wage and comply with all applicable working condition requirements. Question Deadline 11/12/2025 at 5:00 PM PT Requests for clarification or interpretation of the Bidding Documents shall be received, Matt Demonner, University of California, Santa Cruz, demonner@ucsc.edu

Final Planning

Industrial

$2,696,000.00

Public - State/Provincial

Renovation

43

25

11

8

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
370
Active Projects
137
Bidding Soon
2,594
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2025

June 9, 2026

Project location map

1156 High St, Santa Cruz, CA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed