BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 14, 2025 at 7:00 PM

Updated November 15, 2025

Site work and new construction of a civil project in San Francisco, California. Completed plans call for the construction of a 6,000-square-foot water / sewer project; and for site work for a water / sewer project.

The Project is described as: work will consist of the construction of a new public plaza (approximately 6,000 sf), including pile repairs, utility modifications, and installation of new furnishing and lighting. Partial demo of electrical and plumbing lines below the Wharf and selective demo of the concrete slab over the Wharf. The base scope includes pouring a new slab that will act as the surface for the Taylor Street Public Plaza project. This contract includes repairs and replacement for the sub-wharf fire protection system beneath Alioto's, including repairs to the existing fire draft stops. The base scope includes Plaza Art, Wayfinding and furnishings will be under a separate package. The ALTERNATE is to "MAKE READY" the southern portion of FISHERMAN'S GROTTO for future tenant. The ALTERNATE INCLUDES minor exterior regrading to integrate FISHERMAN'S GROTTO with the new p laza. The ALTERNATE scope includes replacing broken windows, replacing existing exterior doors, some interior partitions demo and new construction, replacement of the floor finish in the BOH space and guest area. Contract Monitoring Division Local Business Enterprise (LBE) Subcontracting Requirement: LBE = 10% Time Allowed for Completion: 150 consecutive calendar days (Conditional, refer to Section 00 73 02) License Required: Class "A" California Contractors License The Port reserves the right to reject any or all bids and waive any minor irregularities in any bid. For technical questions on the Bid Documents, to schedule site access, or submit a Request for Product Substitutions, contact the following Project Manager: Port of San Francisco City and County of San Francisco Chris Horiuchi C: 415.609.5840 E: christopher.horiuchi@sfport.com

Bid Results

Water / Sewer

$3,268,000.00

Public - Federal

New Construction, Site Work

47

29

12

5

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
433
Active Projects
182
Bidding Soon
3,498
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 7, 2025

January 12, 2026

Project location map

Taylor St, San Francisco, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.