Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 29, 2026 at 8:00 PM
Updated May 21, 2026
This is a service / maintenance or supply contract in Libby, Montana. Contact the soliciting agency for additional information.
**AMENDMENT 0001 issued 2/18/2026 to incoporate the revised Performance Work Statement (PWS) dated 17 February 2026. The U.S. Army Corps of Engineers, Omaha District is issuing a solicitation for the Responsible Party Oversight, Feasibility Study and Record of Decision, Libby Superfund Site, Libby, Montana. This solicitation is Unrestricted under North American Industry Classification System (NAICS) code 562910. PROJECT LOCATION AND DESCRIPTION: The solicitation will be executed using a Cost-Plus-Fixed-Fee pricing arrangement. Libby is a community in northwestern Montana that is located near a large open-pit vermiculite mine (Operable Unit [OU3). Vermiculite from the mine at Libby is known to be contaminated with amphibole asbestos (tremolite-actinolite series). For the purposes of Environmental Protection Agency (EPA) investigations, this is referred to as Libby amphibole (LA) asbestos. Studies performed at OU3 have detected LA in soil, tree bark, and duff (i.e., organic litter and debris on the forest floor) in the forested areas within the current OU3 boundary and investigations have also shown LA is present in the Rainy Creek watershed. The EPA risk assessment has identified risk drivers for OU3 and a Risk Management Strategy has been developed for the site. Since 2016, the EPA has been gathering data and resolving assumptions with the Potentially Responsible Party (PRP) to move forward with evaluation of different treatment technologies to reduce exposures to LA in dirt, duff, water, sediment, and mine waste in a Feasibility Study. Since higher exposures to LA have been seen during wildfire suppression and mop up activities, the EPA also works closely with the US Forest Service, PRP, state and local partners and other stakeholders to prepare for and prevent wildfires. The considered effort for this solicitation would be to provide responsible party oversight for completion of a PRP-led Feasibility Study and complete a Proposed Plan and Record of Decision on behalf of EPA Region 8. The Feasibility Study effort will use data previously collected to complete a detailed and complex analysis of the information produced by the PRP for identification and screening of technologies; process option evaluation; and development, screening, and detailed analysis of alternatives including cost estimating. After the Feasibility Study is released and public comment has been considered, the EPA and its partners will select a remedy for OU3. The Proposed Plan and Record of Decision will document the remedy selection. PROJECT PERIOD OF PERFORMANCE: 36 months from date of award. Note: Please be advised that an online registration requirement in System for Award Management (SAM) database http://www.sam.gov/ exists and directed solicitation provisions concerning electronic annual Representations and Certifications on SAM. Representations and certifications are required to be up-dated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to SAM.
Award
Military
$2,097,816.00
Public - Federal
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 23, 2026
March 16, 2026
To Be Determined, Libby, MT
Related To This Project
Libby, MT
Bid Date: Mar 24 2026
Libby, MT
Bid Date: Mar 24 2026
Libby, MT
Bid Date: Jun 03 2026
Libby, MT
Bid Date: Oct 10 2025
Libby, MT
Bid Date: Jun 26 2025
Libby, MT
--
Libby, MT
Bid Date: Mar 31 2025
Libby, MT
Bid Date: Mar 12 2025
Libby, MT
Bid Date: Mar 05 2025
Libby, MT
Bid Date: Feb 18 2025
Libby, MT
Bid Date: Nov 27 2024
Libby, MT
Bid Date: Nov 14 2024
Libby, MT
Bid Date: Sep 12 2024
Libby, MT
Bid Date: Jun 20 2024
Libby, MT
Bid Date: Jun 06 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
