Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 30, 2025 at 8:00 PM
Updated October 31, 2025
Site work and new construction of a parking garage in Stonewall, Manitoba. Conceptual plans call for the construction of a 4,740-square-foot, one-story above grade parking garage; and for site work for a parking garage.
Construction of a detached insulated garage (approximate size for Stonewall is 30x38, the others are 30x30), for RCMP's operational use. Stonewall detachment to have a different design (i.e. longer and taller than other garage builds. Different vehicles to be stored). No EV electrical infrastructure required. RCMP Sustainability requirements to apply, as these buildings are heated (e.g. unit heater hanging from ceiling). Civil work would need to be done prior to the building, ensuring a solid foundation (slab on grade, no oversized vehicle) and adequate drainage. Electrical would require at a minimum a 100 amp panel but depending on what operational activities are to take place in the garage, the panel may need to be upsized. No EV electrical infrastructure required. There is no building automation in the detachments. A unit heater would still be required. CAT6 lines should be run from the detachment for security. Garage build sites at: GOC04456 - Ste Rose du Lac, GOC04465 - Swan River Detachment, GOC04462 - Stonewall Detachment and GOC04403 - St Pierre Detachment. RCMP confirmed the following: CORCAN would no longer be involved. 5" slab is likely insufficient. It is noted that an 8" thickened edge is required on the plans. Ventilation is not required, as RCMP will not be storing 5 or more vehicles. Topo survey should not be required (remove topsoil, add base up to appropriate grade). Should aim to begin construction before Aug 31 2026. Ceiling fan not required. HVAC not required. CO and exhaust only required if a code requirement. Ensure compliance with latest applicable Code requirements. Provide Design based on best "Value to Canada"/Minimum Viable Option (MVP). TIMELINE: An RFP for design has been issued. Lifecycle costing analysis based on the GHG Options Methodology will be completed for all garages. The consultant shall complete a lifecycle cost benefit analysis using the "Guideline-Project GHG Options Analysis Methodology" to assess energy and greenhouse gas emission performance of at least four design options. The LCCA to determine feasibility of designing the building to be net zero carbon or net-zero carbon ready. The consultant shall complete a climate risk and vulnerability assessment (CRiVA) during project design and incorporate climate adaptation measures as needed. Refer to Requirements document and CRiVA SOW issued with RFQ documents. DB/TI/Business Case were waived by RCMP. Include cost for winter investigation as required. Question Acceptance Deadline: November 5, 2025, at 12:00 AM CST. Official bid documents must be obtained from www.bgis.merx.com and bid submissions must be done through the Merx platform.
Conceptual
Parking Garage
$540,000.00
Public - Federal
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 27, 2026
Multiple Locations, Stonewall, MB
Related To This Project
Stonewall, MB
Bid Date: Jun 26 2025
Stonewall, MB
Bid Date: May 07 2025
Stonewall, MB
Bid Date: Mar 28 2025
Stonewall, MB
Bid Date: Feb 21 2025
Stonewall, MB
Bid Date: Aug 23 2019
Stonewall, MB
Bid Date: Apr 26 2019
Stonewall, MB
Bid Date: May 07 2024
Stonewall, MB
Bid Date: Apr 15 2024
Stonewall, MB
Bid Date: Mar 21 2024
Stonewall, MB
Bid Date: Mar 21 2024
Stonewall, MB
Bid Date: Mar 15 2024
Stonewall, MB
Bid Date: Feb 29 2024
Stonewall, MB
Bid Date: Mar 14 2024
Stonewall, MB
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
