Published December 10, 2025 at 7:00 PM
Updated December 11, 2025
Site work for a water / sewer project in Hutto, Texas. Completed plans call for site work for a water / sewer project.
The Project includes the following Work: Improvements consist of approximately 16,300 linear feet (LF) of 48-inch and 42-inch diameter wastewater interceptor from Enclave at Brushy Creek Lift Station to the upstream end of the Brushy Creek Interceptor Phase 3 project. The project also includes the decommissioning of the Enclave at Brushy Creek Lift Station. The purpose of the project is to facilitate continued, rapid growth in the City of Hutto which is necessitating the decommissioning of the Enclave at Brushy Creek Lift Station which has reached capacity and is not feasible to expand. Each proposal must be accompanied by proposal security made payable to owner in an amount of five percent (5%) of proposer's total amount proposal and in the form of a certified or cashier's check or a bond issued by a surety meeting the requirements of paragraph 6.01 of the general conditions. - Deadline for Question Submittal 5:00 PM on 12/10/2025 - Any questions, clarifications, concerns or requests for general information should be submitted via the bid portal . Notice of Intent to Award Date 1/8/2026 Notice to Proceed (NTP): Assume January 23, 2026 Substantial Completion Deadline: January 8, 2027 Project Final Competition Deadline: March 12, 2027 Approx. 16,300-LF 48" and 42" FRP installation at depths of 20 - 45' Approx, 2,900-LF of which by microtunneling Decommission Enclave Lift Station Downstream tie-in to Hutto Brushy Creek Wastewater Interceptor Phase 3 Client - CIP WW11-2025 This specification covers the requirements for constructing Insert Name ofProject as shown on the construction Plans and specified herein. The Workis located withinthe City ofGeorgetown as shown ondie LocationMap included inthe Plans. C. The Work includes, but is not necessarily limited to, die following: 1. List Items ofConstruction This specification covers the requirements for the prevention ofenvironmental pollution inconformance with applicable laws and regulations, during and as the result of construction operations under this Contract For the purpose ofthis specification, environmental pollution is defined as the presence of chemical, physical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances ofimportance to human life; affect other species ofimportance to man; or degrade the utility ofthe environment for aesthetic and/or recreational purposes. The control of environmental pollution requires consideration of air, water and land, and involves management ofnoise and solid waste, as well as other pollutants. ENVIRONMENTAL PROTECTION PROCEDURES Schedule and conduct all workin a manner thatwill minimize the erosion ofsoilsinthe area ofthe work. Provide erosion control measures such as diversion channels, sedimentation or filtration systems,berms, seeding, mulching or other special surface treatments as are required to preventsilting and muddying of streams, rivers, impoundments, lakes, etc. All erosion control measures shall be inplace in an areaprior to any construction activity in that area. Specific requirements are specified in Section G6- SEDIMENTATION AND TEMPORARY EROSION CONTROL. These Specifications are intended to ensure that construction is achieved with a minimumofdisturbance to die existing ecological balance between a water resource and its surroundings. These are general guidelines. It is the Contractor's responsibilityto determine the specific constructiontechniques to meet these guidelines. All phases ofsedimentation and erosion control shall comply with and be subjectto the approval ofthe Texas Commission on Environmental Quality, and U.S. EPA. This specificationcoversthe administrative and procedural requirements for Project closeout, including but not limited to: Closeout procedures. Final cleaning. Adjusting. Projectrecord documents. Spare parts and maintenance materials. SE LOOP, HUTTO, TEXAS 78634 CR 137, HUTTO, TEXAS 78634 BRUSHY CREEK, TEXAS 78634 Approx, 2,900-LF of which by microtunneling
GC Bidding
Water / Sewer
$165,935.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 19, 2025
January 19, 2026
Multiple Locations, Hutto, TX
Related To This Project
Hutto, TX
--
Hutto, TX
Bid Date: Dec 30 2025
Hutto, TX
Bid Date: Oct 14 2020
Hutto, TX
Bid Date: Dec 02 2025
Hutto, TX
Bid Date: Dec 03 2025
Hutto, TX
Bid Date: Dec 19 2025
Hutto, TX
--
Hutto, TX
--
Hutto, TX
Bid Date: Nov 26 2025
Hutto, TX
Bid Date: Nov 21 2025
Hutto, TX
Bid Date: Oct 15 2025
Hutto, TX
--
Hutto, TX
Bid Date: Oct 30 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.