BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 6, 2026 at 7:00 PM

Updated January 7, 2026

Site work for a stadium in Pensacola, Florida. Working plans call for site work for a stadium.

Bid is cancelled, As per the owner the project has been cancelled. Editorial content team is actively seeking updated information. Reference Number 0000403327 The University of West Florida (UWF) is undertaking the construction of a new stadium. This project includes the pre-design and structural accommodations necessary for the subsequent installation of a new, state-of-the-art video board. Vendors are invited to submit proposals meeting the detailed technical specifications and requirements outlined in this solicitation document. The University of West Florida is constructing a new Satellite Utility Plant designed to accommodate implementation of proposed phased building expansion over the next decade. The electrical components are for this project. Delivery to University of West Florida, Main Campus, 11000 University Parkway, Pensacola, Florida. FOB Destination. Bidder shall be responsible for providing labor, rigging, crane rental, etc. as required for offloading the equipment The final location is to be determined by the University and will be communicated prior to delivery. Bidder shall coordinate delivery with University's representative. Bidder shall provide a cost to install the system onto an owner constructed structure and an alterative option to construct the structure. Question Deadline 11/07/2025 at 10:00 AM CT Questions are submitted online Yes Video Board Specs I. Video Board: Size: 85' W x 30' H Pixel pitch: 10mm Control system: Primary and hot backup Non-lit ad panel on both sides of the filming platform. The sound system can be part of this structure. Decorative element above the sound system enclosures and filming platform. Give lighted and unlighted lettering options. II. Fixed digit scoreboard - on south end Installed on facade of the existing building - Darrell Gooden Center, Bldg 234 Approximate dimension 30'W x 4'H Display: team name, game time, score, down, to to, ball on, quarter, TOL Electronic team names. Capability to be used as a segment timer. White digits Scoreboard controllers: 2 each - 1 primary, 1 secondary 1 each - Wireless portable controller to control the fixed digit scoreboard from field level. III. Sound system Point source system to cover entire seating areas Must be able to provide capability to sync with the sound system for suites, club, press box, etc. IV. Game clock - stand alone to be located in front of filming platform 1 each Options for 30" and 36" digit size White digits V. Play clocks 2 each Options for 30" and 36" digit size White digits VI. Locker room clocks 4 each Digit size - 4" White digits The project must be completed, including installation and testing, before July 31, 2026.

Final Planning

Arenas / Stadiums

$50,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
0
Bidding Soon
496
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 20, 2025

July 6, 2026

Project location map

11000 University Pkwy, Pensacola, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.