BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 15, 2026 at 7:00 PM

Updated January 16, 2026

Site work for a water / sewer project in Twinsburg, Ohio. Completed plans call for site work for a 14,912-square-foot, one-story above grade water / sewer project; and one-story above grade water / sewer project.

The current negotiated goal for construction related activities is 5.4% (the total goal is based on 3.1% of MBEs and 2.3% of WBEs participation). The work included in this project generally consists of general site work, Flow Equalization, Tertiary Treatment, and Disinfection improvements for the City of Twinsburg Wastewater Treatment Plant. The project includes a new 130-foot-long by 64-foot-wide by 18-foot-deep 1-million-gallon flow equalization basin, which will provide a total storage capacity of 3 million gallons. Other improvements involve enhancing cleaning operations with the use of tipping buckets, replacing the existing mixing system and adding a mixing system to the new EQ tank, replacing the EQ pump station pumps and drain pumps, and updating the overflow totalizing flow meter, instrumentation and level control for operations. New disc filter equipment will be installed to replace the existing microstrainers. The plan is to upgrade the existing facility with new equipment and perform necessary building improvements to meet code and streamline maintenance and operation of the filters in the future. The work generally consists of general site work, Flow Equalization, Tertiary Treatment, and Disinfection improvements for the City of Twinsburg Wastewater Treatment Plant. The project includes a new 130-foot-long by 64-foot-wide by 18-foot-deep 1-million-gallon flow equalization basin, providing a total storage capacity of 3 million gallons. Additional improvements include enhancing cleaning operations with tipping buckets, replacing the existing mixing system and adding a mixing system to the new EQ tank, replacing the EQ pump station pumps and drain pumps, and updating the overflow totalizing flow meter, instrumentation, and level control for operations. Q&A Deadline no later than 12/05/2025 at 04:00 PM EST

Award

Water / Sewer

$11,150,000.00

Public - City

Site Work

186

37

23

9

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
268
Active Projects
124
Bidding Soon
1,658
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2025

February 9, 2026

Project location map

10231 Ravenna Rd, Twinsburg, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.