BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 5, 2026 at 7:00 PM

Updated January 6, 2026

Site work for a civil project in Atmore, Alabama. Working plans call for site work for a one-story above grade water / sewer project; and one-story above grade water / sewer project.

As of 1/5/2026, this project will be rebid. The work generally consists of the installation of approximately 6600 linear feet of sanitary sewer and a wastewater treatment package plant at the Magnolia Branch Wildlife Reserve; installation of approximately 17 manholes for the associated wastewater system improvements; and associated work. The entire project shall be completed in one hundred fifty (150) calendar days. A cashier's check (drawn on an Alabama bank) or bid bond for 5% of the amount bid (maximum - $50,000.00) and made payable to Poarch Band of Creek Indians must accompany each bid as evidence of good faith. It is not required that a contractor be licensed in order to submit a bid; however, prior to award of a contract, proper proof of all applicable licensures must be provided by the contractor. Proof of insurance coverages of the types and amounts as set forth in the project specifications will be required of the contractor, and any and all subcontractors, prior to beginning work. The contractor will be required to perform work amounting to at least 30% of the total contract cost with his own organization. Contractor prequalification is not required to bid on this project. Official bid documents can be downloaded from the specified website. No bid documents will be distributed later than 24 hours prior to the scheduled opening of bids. Indian preference shall be offered to certified businesses in accordance with Titles 33 and 37 of the Tribal Code of the Poarch Band of Creek Indians. The right to reject any or all bids and to disregard any minor irregularities is reserved by the owner. Question Deadline 11/26/2025 at 5:00 PM CT All questions or clarification requests must be sent by email to Tracy Bottjer, Procurement Officer, at tbottjer@pcinsn.gov, If an addenda is necessary it will be issued to the email addresses on file.

Final Planning

Water / Sewer

$2,832,668.00

Public - Federal

Site Work

26

9

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
36
Bidding Soon
772
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2025

July 6, 2026

Project location map

24 Big Creek Road, Atmore, AL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.