BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 4, 2025 at 7:00 PM

Updated December 5, 2025

Site work for a water / sewer project in Jacksons Gap, Alabama. Completed plans call for site work for a one-story above grade water / sewer project.

The project involves the installation of approximately 6,200 linear feet of 8-inch PE 4710 DR11 IPS water main, 120 linear feet of 6-inch ductile iron water main (PC 350), and associated appurtenances along Highway 280 from Peckerwood Road to Blackwelder Road. There is an additive alternate to install approximately 7,000 additional linear feet of 8-inch PE 4710 DR11 IPS water main, 620 linear feet of 6-inch ductile iron water main (PC 350), and associated appurtenances along Highway 280 from Blackwelder Road to Main Street. The project must be substantially completed within 120 calendar days after the contract time commences and fully completed and ready for final payment within 150 calendar days after the contract time commences. Copies of bidding documents may be obtained from the issuing agent. Only properly licensed contractors are eligible to bid, and bidders must carry the MU Municipal and Utility classification as listed in the latest edition of the Roster of the State Licensing Board for General Contractors, Montgomery, Alabama. Nonresident contractors must submit evidence of proper registration and a certificate of good standing from the Alabama Department of Revenue. All or part of this project may be funded by a subaward of ARPA funds, and all terms and conditions of ARPA funding apply. Bidders must be eligible to receive federal funding and not be debarred or suspended from doing so. Preference shall be given to resident contractors according to state law. Question Deadline 11/30/2025 at 1:00 PM CT Cason Stevens, Engineer, at cason.stevens@3notch.com. Questions received less than three (3) calendar days prior to the date for opening of Bids may not be answered.

Post-Bid

Water / Sewer

$1,000,000.00

Public - City

Site Work

16

12

2

3

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
56
Bidding Soon
882
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2025

February 2, 2026

Project location map

Highway 280 from Peckerwood Road to Blackwelder Road, Jacksons Gap, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.