BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 6, 2025 at 7:00 PM

Updated January 1, 2026

This is a service / maintenance or supply contract in Elk Grove, California. Contact the soliciting agency for additional information.

All contractors required to pre-qualify for Elk Grove Unified School District projects must adhere to specific procedures, submit certain documentation and information annually, provide quarterly certifications or updates, and be found pre-qualified by the District quarterly as a condition of bidding any District project during any quarterly period. The pre-qualification process is mandatory for all General Contractors and Mechanical, Electrical and Plumbing Subcontractors bidding on projects projected to cost $1,000,000 or more. Pre-qualification packages, including a questionnaire and financial statement to be verified under oath, must be completed and submitted for review. The District will use these materials to rate contractors based on the size and scope of contracts for which they are qualified to bid, reserving the right to check other sources and use objective evaluation criteria and references in their decisions. Each entity in joint ventures must be separately qualified. Any inaccuracies or changes in application information must be immediately updated and certified under penalty of perjury. If prequalified, a quarterly update must be provided; otherwise, a new full pre-qualification package will be required. Pre-qualification packages should be marked “CONFIDENTIAL PREQUALIFICATION” and delivered electronically or to the Facilities and Planning Department, Elk Grove Unified School District, 9510 Elk Grove-Florin Road, Room 206, Elk Grove, CA 95624, Attention: Pre-Qualification. Questionnaire answers and financial statements are confidential, except as otherwise required by law, and contractor names are public records subject to disclosure. No bid will be accepted from contractors or listed MEP subsidiaries who have not met all these requirements. Pre-qualification requirements: - Contractors must submit a completed pre-qualification application package including a questionnaire and financial statement annually, with quarterly updates certifying material accuracy. - Pre-qualification is mandatory for all General Contractors and Mechanical, Electrical, and Plumbing Subcontractors bidding on District projects of $1,000,000 or more. - Each entity in a joint venture must be separately qualified. - Contractors and subcontractors must register with the Department of Industrial Relations as required by Labor Code section 1725.5. - Packages must be submitted electronically or delivered to the stated address, marked appropriately. - Application must be signed under penalty of perjury by an authorized individual. - Contractors must notify the District of any changes to their application that could affect its accuracy.

Post-Bid

Educational

$1,000,000.00

Public - City

Service, Maintenance and Supply

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
154
Active Projects
24
Bidding Soon
1,952
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 31, 2025

February 16, 2026

Project location map

9510 Elk GroveFlorin Road, Elk Grove, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.