Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 9, 2026 at 7:00 PM
Updated February 10, 2026
Site work and new construction of a mixed-use development in Fruitland, New Mexico. Completed plans call for the construction of a water / sewer project; for site work for a water / sewer project; and municipal facility.
**As of February 9, 2026 , this project has not yet been awarded. The project is expected to be awarded late March or early April 2026.** Bureau Of Reclamation San Juan Lateral Reach 1 Intake & River Pumping Plant Navajo-Gallup Water Supply Project - Upper Colorado Basin Region: The principal components of work for Intake & River Pumping Plant (PP) include, but are not limited to, the following: A. Construct New River Pumping Plant: 1. Sitework, including cement-bentonite cutoff wall. 2. Steel manifold piping, including connection to existing ductile iron line pipe. 3. Metal building system and foundations. 4. Cast-in-place concrete building structures. 5. Vertical turbine pumping units. 6. Air chambers. 7. Electrical system. 8. SCADA system. 9. Water quality monitoring equipment. B. Selective site demolition. C. Demolition of Existing Pumping Plant. D. Existing channel modifications: 1. Replace trash rake and sluice gate at intake. 2. Install gates. 3. Construct fish barrier weir and return channel. 4. Concrete modifications. Question Deadline 12/15/2025 at 9:00 AM MT All questions shall be submitted electronically to ajones@usbr.gov and aloveless@usbr.gov. Addendum #1-#7 have been issued as of 1-13-2026.
Post-Bid
Water / Sewer
$85,000,000.00
Public - Federal
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 16, 2026
April 3, 2026
To Be Determined, Fruitland, NM
Related To This Project
Clovis, NM
--
Eagle Nest, NM
--
Silver City, NM
Bid Date: Dec 02 2025
Aztec, NM
Bid Date: Dec 08 2025
Youngsville, NM
Bid Date: Nov 18 2025
Santa Fe, NM
Bid Date: Dec 17 2025
Capitan, NM
Bid Date: Dec 09 2025
Clovis, NM
Bid Date: May 20 2026
Las Cruces, NM
Bid Date: Nov 19 2025
Farmington, NM
Bid Date: Nov 26 2025
Carrizozo, NM
Bid Date: Dec 09 2025
Santa Fe, NM
Bid Date: Dec 01 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
