Published January 5, 2026 at 7:00 PM
Updated January 6, 2026
Site work for a water / sewer project in McCormick, South Carolina. Completed plans call for site work for a water / sewer project.
The purpose of this solicitation is to acquire maintenance and repair services for the water tower critical deficiency items and some preventative maintenance items found on the inspection report at Hickory Knob State Resort Park. It is the intent of this solicitation to procure repair and maintenance services for the water tower critical deficiency items and some preventative maintenance items found on the inspection performed July 22, 2025 at Hickory Knob State Resort Park. Established in 1973, Hickory Knob is a picturesque, resort state park with 18-hole championship golf course, 77-unit motel, restaurant, campground and access to many types of outdoor recreation by the scenic shores of Lake Thurmond. The water tower was erected in 1972. It has a 100,000 gallon elevated tank with HWL-124'7"; LWL-100'; Diameter-28', and HT-24'7" SCOPE OF WORK/SPECIFICATIONS It is the intent of this solicitation to procure repair and maintenance services for the water tower critical deficiency items and some preventative maintenance items found on the inspection performed July 22, 2025 at Hickory Knob State Resort Park. Established in 1973, Hickory Knob is a picturesque, resort state park with 18-hole championship golf course, 77-unit motel, restaurant, campground and access to many types of outdoor recreation by the scenic shores of Lake Thurmond. The water tower was erected in 1972. It has a 100,000 gallon elevated tank with HWL-124'7"; LWL-100'; Diameter-28', and HT-24'7" Scope of work 1. Install locks on primary and secondary roof hatches. (2) 2. Post Confined Space Entry signs on primary and secondary roof hatches. (2) 3. Replace the existing roof vent with a vacuum-pressure, frost proof vent and screen. 4. Perform a dry interior cleanout. Arrange with park manager for emptying water tank prior to work scheduling. 5. Abrasive blast all rusted and abraded interior areas to SSPC-SP10 (near white), and brush blast all remaining interior areas to SSPC-SP7: then apply on (1) spot coat of epoxy primer to all areas blasted to #10, stripe coat all weld seams, apply an epoxy liner to the entire tank to achieve 8 to 10 mils of total dry film thickness. Total mil thickness will include a combination of the existing and new coating. 6. Seam seal all un-welded interior roof lap seams using Sikaflex 1a in conjunction with application of new interior liner as stated in item 4. 7. Install a passive cathodic protection system. 8. Drill additional weep holes in the balcony floor. 9. Electrically ground the tank 10. Remove the coax cable from the exterior tower access ladder and secure it to the tank leg with standoffs.Vendor Staff Qualifications/Responsibilities 1. vendor will provide all materials, labor, equipment and insurance necessary to complete all work. 2. vendor will ensure that all materials and methods of installation comply with industry standards. 3. Vendor shall have good communication skills to engage with park representatives to relay information, report repair issues and update park staff of repair progress. 4. Vendor shall have adequate financial resources to cover the cost of providing the service (equipment, supplies, personnel, etc.) 5. After award but prior to start of work meet with SC PRT staff to plan course of action for project completion. 6. Contractor is responsible for using safety precautions to ensure that their employees, and anyone who may come within the work perimeter, will not be injured. This may include, but not be limited to, the use of appropriate barricades, signs, safety harnesses and equipment, and personnel. 7. Contractor will assume liability for damage or loss resulting from the wrongful acts and/or negligence of his employees while they are on the premises. 8. A Supervisor shall be on site while work is being performed. 9. All personnel assigned by the Contractor for the performance of the work of this contract shall be capable employees who are qualified to do this type of work. Question Deadline 11/21/2025 at 12:00 PM ET
Post-Bid
Water / Sewer
$400,000.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 4, 2025
January 5, 2026
1498 Resort Dr, McCormick, SC
Related To This Project
McCormick, SC
Bid Date: Dec 18 2025
McCormick, SC
--
McCormick, SC
Bid Date: Dec 15 2025
McCormick, SC
Bid Date: Nov 19 2025
McCormick, SC
Bid Date: Jul 10 2025
McCormick, SC
Bid Date: Jul 15 2025
McCormick, SC
Bid Date: Jun 17 2025
McCormick, SC
Bid Date: May 30 2025
McCormick, SC
Bid Date: May 01 2025
McCormick, SC
Bid Date: Apr 15 2025
McCormick, SC
Bid Date: Feb 27 2025
McCormick, SC
Bid Date: Mar 11 2025
McCormick, SC
Bid Date: Feb 26 2025
McCormick, SC
Bid Date: Jan 28 2025
McCormick, SC
Bid Date: Jan 15 2025