BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 26, 2025 at 7:00 PM

Updated November 27, 2025

Site work for a water / sewer project in London, Kentucky. Completed plans call for site work for a water / sewer project.

The project will include the installation of approximately 7,600 LF of 12-inch PVC Force Main, 500 LF of 12" HDPE Force Main, three (3) Air Release Valves, and other associated appurtenances. The OWNER reserves the right to waive any informality or to reject any or all bids. Each BIDDER must deposit with his Bid, security in the amount, form and subject to the conditions provided in the Instructions to Bidders. No BIDDER may withdraw his Bid within sixty (60) consecutive calendar days after the actual date of the opening thereof. Questions shall be addressed to Steve Baker, P.E. of Midwest Engineering, Inc, as stated in the Specifications or by email to steve@midwestengineering.net.

Post-Bid

Water / Sewer

$2,000,000.00

Public - City

Site Work

12

10

4

7

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
66
Bidding Soon
608
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 25, 2025

January 26, 2026

Project location map

Multiple Locations, London, KY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.