Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 8, 2025 at 7:00 PM
Updated November 25, 2025
Site work and new construction of a water / sewer project in Havelock, North Carolina. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
Planning and Design for the future construction of new Depot Maintenance Buildings for New Vessels at the Cherry Branch Ferry Harbor. Project to include 4 new buildings (admin office, staff offices & break, maintenance shop, and storage warehouse) as well as a concrete pier for vessel repairs. The proposed project site is approximately 2 acres. Phase 1: Completion of a Planning Study to confirm the size and location of the proposed new buildings as well as provide a detailed project cost estimate to confirm project funding needs. Phase 2:Upon completion of the Planning Study for Phase 1, a standard design contract would be issued for the required Design, Bidding, Construction Administration, and Closeout services. The Cherry Branch Ferry Terminal is located at 2300 Ferry Road in Havelock, NC. n order to offer architectural, engineering, or landscape architectural services in response to this solicitation, the proposing firm must be properly licensed to practice Architecture, Engineering, or Landscape Architecture in the State of North Carolina. More information on the North Carolina state boards may be found at Online.
Post-Bid
Water / Sewer
$10,093,000.00
Public - State/Provincial
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 24, 2025
January 23, 2026
2300 Ferry Rd, Havelock, NC
Related To This Project
Havelock, NC
Bid Date: Dec 18 2025
Havelock, NC
Bid Date: Nov 27 2025
Havelock, NC
Bid Date: Nov 25 2025
Havelock, NC
--
Havelock, NC
Bid Date: Nov 25 2025
Havelock, NC
Bid Date: Nov 04 2025
Havelock, NC
Bid Date: Nov 14 2025
Havelock, NC
Bid Date: Nov 14 2025
Havelock, NC
Bid Date: Nov 25 2025
Havelock, NC
Bid Date: Oct 24 2025
Havelock, NC
Bid Date: Sep 24 2025
Havelock, NC
Bid Date: Dec 01 2025
Havelock, NC
Bid Date: Sep 15 2025
Havelock, NC
Bid Date: Sep 12 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
