BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 25, 2025 at 7:00 PM

Updated November 26, 2025

Site work for a bridge / tunnel in Salmon, Idaho. Completed plans call for site work for a one-story above grade bridge / tunnel.

The project consists of replacement of a buried approximately 120 linear feet, 4-foot diameter CMP with an open bottom custom arch pipe structure. The Contractor will be required to provide temporary road access for residents up EF Tower Creek Road during construction. Construction includes excavation of approximately 5,000 cubic yards of earthwork, procuring and installing a 20-foot span by 16-foot rise arch pipe, providing engineered pre-cast footings, 170 square feet of gabion wire wingwalls, and backfill on the County gravel road. Instream construction window is July 1 to August 16. Bids require a bid bond in the amount of 5% of the bid. A Public Works Contractors License for the State of Idaho is required for the successful bidder if the bid amount is greater than $50,000. Names and Public Works License numbers must be included on the Sub-Contractor List if the total project value exceeds $50,000. Attention is called to the employment conditions to be observed, and all craftsmen and laborers must be paid at least the minimum prevailing wage rate as determined for this area by the U.S. Department of Labor.

GC Bidding

Bridges / Tunnels

$1,000,000.00

Public - State/Provincial

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
1
Bidding Soon
40
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 22, 2026

March 9, 2026

Project location map

E Tower Creek Road, Salmon, ID

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.