Published December 30, 2025 at 7:00 PM
Updated December 31, 2025
Site work for a pipeline in Fairhope, Alabama. Completed plans call for site work for a one-story above grade pipeline.
As of December 30, 2025, project was awarded to GMC Underground, awarded amount is $392,815.48. Furnish all labor and materials, and perform all work required to extend a 4" gas main via directional drilling along the west side of Highway 181 from south of Silverwood Dr. to Dominion Dr., for approximately 18,500 feet of 4" PE pipe. The contractor is responsible for acquiring all permitting and providing all materials, personnel, tools, and equipment necessary for the project. All bids must be submitted on blank bid forms provided in the bid documents, enclosed in a sealed, opaque envelope, clearly identified as a "Sealed Bid" with the item name, bid number, City of Fairhope's name and address, and contractor's name and address. Each bid must be in a separate envelope. Bids made out in pencil will not be accepted. Failure to observe the instructions may result in rejection of the bid. No bids will be considered unless the contractor, whether resident or non-resident of Alabama, is properly qualified to submit a proposal for this type of work in accordance with all applicable Alabama laws, and, where applicable, must include evidence of holding a current license from the State Licensing Board for General Bidders. Non-resident corporations must also show evidence of qualification with the Secretary of State to do business in Alabama. Contractors must have a current business license or purchase one with the City of Fairhope prior to performing work. Bids may not be withdrawn for 30 days after proposal opening without the consent of the City of Fairhope. The City of Fairhope is requesting an existing 4" PE gas main to be extended via directional drilling along the West side of HWY-181. Tie-In point #1 will be on the west side of HWY-181 just south of Terrace Drive. Tie-In point #2 will be on the southwest side of the intersection of HWY 98 & HWY-181. (See map drawing provided by City of Fairhope Gas Department for detailed proposed path). Tie-in point #3 will be on the east side of Dominion Drive on HWY-98. The contractor selected will be held responsible for furnishing all materials, personnel, tools, equipment and pipe. The contractor will also be responsible for verification of pipe sizes/type, utility locations, soil/hole stabilizations, erosion control (temporary and permanent), trench boxes, traffic control, connections, taps, site restoration etc. that is necessary throughout the duration of this project to its completion with the exception of materials for valve boxes, valve extensions, valve lids, and location markers. Questions or comments pertaining to this bid must be presented in writing, sent as e-mail to the attention of the Purchasing Manager, Erin Wolfe, 555 South Section St., Fairhope, AL 36532, e-mail: Purchasing@FairhopeAL.gov, by Monday, December 8, 2025, at 11:00 A.M. or will be forever waived.
Award
Pipeline
$392,815.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 11, 2025
February 9, 2026
Highway 181 South of Silverwood Dr to Dominion Dr, Fairhope, AL
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.