BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 12, 2025 at 7:00 PM

Updated December 13, 2025

Site work for a water / sewer project in West Lafayette, Indiana. Completed plans call for site work for a water / sewer project.

Lambert Fieldhouse Suite 204-205 FCU Replacement and Domestic Water Backflow Preventer Installation 1. West Lafayette Campus - Cordova Rec Sports Center Sections A & E Roof Replacement - 2025 2. West Lafayette Campus - Hangar 6 Office Reconfiguration - 2025 3. West Lafayette Campus - Lambert Fieldhouse Suite 204-205 FCU Replacement and Domestic Water Backflow Preventer Installation - 2025 4. West Lafayette Campus - MacArthur Drive to Mitch Daniels Boulevard Renovation - 2025 5. West Lafayette Campus - Physical Facilities Service Building Chiller Replacement - 2025 6. West Lafayette Campus - Purdue Memorial Union Elevator 4 Modernization - 2025 7. West Lafayette Campus - Various Parking Lot Repairs - 2025 Each bid must be accompanied by a Contractor's Combination Bid Bond and Bond for Construction in the form included in the specifications made payable to The Trustees of Purdue University in an amount equal to the maximum total of the base bid and any alternate bids, guaranteeing the execution and faithful performance of the contract for the work if awarded. The Instructions to Bidders contained in the specifications for the projects are by this reference made a part hereof, and all bidders shall be deemed advised of the provisions thereof, and of the General Conditions of the contract, specifications, plans and drawings for the project. The remainder of the Questionnaires and Material Lists shall be submitted prior to 3:00 p.m. (EST) on the 18th day of December 2025, to Capital Asset Management, 2550 Northwestern Avenue, Suite 1100, West Lafayette, IN 47906, Phone (765) 494-0580. Doc note: Postage and handling fees may apply. All orders must be placed online but bidders may choose to pick up orders at Purdue Print & Digital Services delivered by Xerox, 698 Ahlers Drive, West Lafayette, IN 47907, Phone: 765-494-2006. Bidding Documents are on file in the office of Senior Vice President for Administrative Operations, 2550 Northwestern Avenue, Suite 1100, West Lafayette, IN 47906, Phone (765) 494-0580. The Board of Trustees of The Trustees of Purdue University reserves the right to reject any and all bids and to waive, to the extent permitted by law, any of the terms, conditions and provisions contained in this Advertisement for Bids or the Instructions to Bidders or any informality, irregularity or omission in any bid, provided that such waiver shall, in the discretion of the Board of Trustees, be to the advantage of The Trustees of Purdue University. SCOPE OF PROJECT A. Install a new domestic water Back Flow Preventer (BFP) on the west side of the Lambert building in the basement area near where the water enters into the building. BFP to include by-pass and other typical components to match Purdue standard. Drains from BFP to be routed to the nearest floor drain. B. Install new exhaust fan in room 204. Fan to exhaust to exterior. C. Suite 205 A-D: a. Demolish lights, ceiling grid and tile, fan coil units (FCUs), duct work, existing freon lines, and controls. Existing 3 rd floor window louver for outside air to remain. Demolish the controls, compressor, power, and cabinet in fieldhouse. Demolish water lines and cap as needed. Remove freon from existing HVAC. Install dust protection as needed. Remove furniture as needed. Remove furniture prior to construction and reinstall furniture at the end of construction. Work with REM (EH&S) to remove asbestos as needed. b. Install new chilled water FCU coils and ductwork as needed to rooms 205 A-D and corridor 205. Install new ceiling diffusers and grilles as needed. Connect to FY 25 project shut-off valves for the second floor in the fieldhouse. c. Install new steam reheat coils to room 205 corridor and rooms 205 A-D. d. Install steam lines and chilled water lines as needed. e. Install new OA as needed. f. Install new DDC controls and control valves/dampers to new units. Controls to be Siemens. g. Install new ceiling grid and tile. h. Install new lighting and controls. i. Patch walls as needed. Paint walls and clean flooring in rooms 205 & 205A-D Location- 800 W Stadium Ave. West Lafayette, IN 4790 Question Deadline 12/18/2025 at 3:00 PM ET

Bid Results

Water / Sewer

$250,000.00

Public - State/Provincial

Site Work

17

15

9

8

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2025

May 19, 2026

Project location map

800 W Stadium Ave, West Lafayette, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.