BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 4, 2025 at 7:00 PM

Updated December 5, 2025

Site work for a development in Saint Paul, Nebraska. Completed plans call for site work for a one-story above grade development.

Question Deadline 11/27/2025 Bidders requiring clarification or interpretation of the Bidding Documents shall make a request to the Architect/Engineer at least seven days prior to the date for receipt of bids WORK INCLUDED A. The proposed work consists of Range Development at Cedar Valley Wildlife Management Area for the Nebraska Game and Parks Commission. B. Base Bid. Note that list is general and does not include every item. 1. Demolish existing fence around the existing parking area and part of the fence along the railway right-of-way. 2. Salvage existing surfacing gravel from the existing parking lot. 3. Clear and grub existing stumps in the construction area. 4. Strip topsoil from the earthwork site. 5. Excavate, move, place, and compact earth as required for the range. 6. Coordinate with NGPC staff and the Lincoln County Highway Superintendent to replace the CMP at the entrance to the range. 7. Install a CMP for drainage where an ADA rout will cross the CL of the draw. 8. Install crushed limestone surfacing for the accessible walks and washed road gravel surfacing for the new parking lot and its entrance to the county road. 9. Replace topsoil and perform finish grading. 10. Sow seed. 11. Install erosion control blankets on slopes 4H:1V and steeper. 12. Apply straw cover to areas seeded but not covered with blankets. 13. Estimated Quantities BASE BID ESTIMATED QUANTITIES Description Quantity Unit ---------------------------------------------------------------------------- Demo Barbed Wire Fence 680 LF Demo Wood Rail Fence 275 LF Salvage Gravel Surfacing 900 SY Grub & Pile Stumps 1 LS Strip Topsoil 4,000 CY Subsoil Excavation 36,000 CY Subsoil Embankment 26,000 CY Replace & Finish Grade Topsoil 4,000 CY 36" CMP, Installed 60 LF 36" CMP Flared End Sections, Installed 2 EA 12" CMP, Installed 50 LF 12" CMP Flared End Sections, Installed 2 EA 6"-thick Washed Gravel Surfacing 120 TN 5"-thick 1/4 " Crusher-run Limestone Surfacing 70 TN Seeding, Low Slope Mix 4.3 AC Seeding, Steep Slope Mix 3.2 AC Erosion Control Blanket, Moderate Slope 14,300 SY

Post-Bid

Conservation and Development

$464,000.00

Public - State/Provincial

Site Work

18

11

12

5

Subscribe For Documents

72 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
16
Bidding Soon
227
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2025

January 5, 2026

Project location map

Railroad Right of way, Saint Paul, NE

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.