BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 14, 2025 at 7:00 PM

Updated November 15, 2025

Site work, paving, new construction, remodeling and renovation of a mixed-use development in Goose Lake, Iowa. Conceptual plans call for the construction of a educational facility; for the renovation of a educational facility; for site work for a educational facility; and for paving for a educational facility.

Plans call to build and equip new Career and Technical Education spaces at the middle/high school; remodel with HVAC, electrical, fire alarm, restroom, and strength/conditioning upgrades. This project was part of the school district's bond. As of November 14, 2025, the bond failed.

Conceptual

Educational

$13,500,000.00

Public - City

New Construction, Paving, Remodeling, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
170
Active Projects
101
Bidding Soon
1,285
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2027

Project location map

Multiple Locations, Goose Lake, IA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.