BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 14, 2025 at 7:00 PM

Updated December 5, 2025

Paving and renovation of a mixed-use development in Northfield, Illinois. Completed plans call for the renovation of a one-story above grade educational facility; one-story above grade playground / park / athletic field; and one-story above grade educational facility.

The Board of Education is accepting bids from subcontractors for a renovation project at a high school in Northfield, Illinois. The general scope of work includes exterior athletic field renovations and an interior cafe renovation at the Northfield Campus. The project includes all labor, materials, machinery, tools, equipment, and other means necessary for completion of the work indicated, such as temporary facilities and controls, demolition, cast-in-place concrete, metal fabrications, rough carpentry, plastic paneling, insulation, firestopping, joint sealants, access doors, overhead coiling grilles, door hardware, non-structural metal framing, gypsum board, ceramic tiling, acoustical panel ceilings, wood panel ceilings, resinous flooring, interior painting, signage, fire protection cabinets, athletic netting, food service equipment, various countertop installations, fire suppression sprinkler systems, plumbing, HVAC, electrical, structured cabling for voice and data, extensions to intercom and fire alarm systems, security systems, site clearing, earthmoving, paving, decorative bollards, playground surfacing, fencing, soil preparation, landscaping, water utility and storm drainage piping. Instructions to bidders include obtaining bid documents from Pepper Construction, attending a pre-bid meeting where requirements will be reviewed, submitting sealed bids by the stated deadline, and accompanying each bid with a Bid Bond of ten percent of the Base Bid. Bids must be guaranteed for ninety days from the opening date and include an AIA A305 Contractors Qualifications Statement. Successful subcontractors must provide Performance and Payment Bonds for 100% of the contract sum. Contractors must pay prevailing wage rates and submit certified payrolls electronically. The Board of Education reserves the right to accept or reject any bids or waive irregularities.

Post-Bid

Educational

$15,000,000.00

Public - City

Paving, Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
504
Active Projects
297
Bidding Soon
3,610
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2025

March 16, 2026

Project location map

7 N Happ Rd, Northfield, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.