BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 12, 2025 at 7:00 PM

Updated December 13, 2025

Site work, paving and new construction of a bridge / tunnel in Maryville, Missouri. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; and for the construction of a bridge / tunnel.

The proposed work includes: Construction of a three-span, 275 foot long Pre-stressed I Girder Bridge and associated roadway work on 352nd Street northwest of Maryville, Missouri. All bidders must be on MoDOTs Qualified Contractor List per Section 102.2 from the current version of the Missouri Standard Specifications for Highway Construction, including all revisions. Calendar Days: 180 Calendar Days from the notice to proceed, whichever is earlie Liquidated damages per day $1,225 per Calendar Day Question Deadline 12/02/2025 The contractor questionnaire must be on file 7 days prior to bid opening. A DBE goal of 0.0% has been established for this project. The right is reserved to reject any or all bids.

Bid Results

Bridges / Tunnels

$2,206,677.00

Public - County

New Construction, Paving, Site Work

24

9

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
36
Bidding Soon
883
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2025

January 8, 2026

Project location map

352nd Street northwest of Maryville, Maryville, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.