BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 21, 2025 at 7:00 PM

Updated December 6, 2025

Site work for a mixed-use development in Wheaton, Illinois. Completed plans call for site work for a communication facility; and road / highway.

Project Summary Project Title: Main Ring Electrical P-F3 to P-F4 15KV Cable Installation Project Number: FESS Project 3-7-103B Notice ID: 375108-CD Scope of Work: The subcontractor shall provide all necessary labor, materials, transportation, overhead, insurance, bonding costs, safety oversight, quality control oversight, supervision, and equipment required to complete the installation of a 15KV cable between locations P-F3 and P-F4. The work must comply with the specifications and drawings referenced in the solicitation, including: Specification Sections: 010010 -General Requirements (March 2025) 013100 - FRA Environment, Safety, and Health Requirements (April 2025) 013300 - Submittals (January 2025) 014100 - Quality Requirements (October 2025) Key Deliverables: Installation of 15KV cable per approved drawings and specifications Compliance with FRA safety and environmental standards Submission of required documentation and quality control reports Coordination with project stakeholders for timely completion All questions concerning this RFP should be submitted in writing and directed to the Procurement Specialist listed below. Procurement Specialist: Chris Daley, CPPO, CPPB Phone: (630-840-4256 Email: cdaley@fnal.gov Fermi Forward Discovery Group, LLC Procurement Department Kirk Road & Wilson Street Batavia, IL 60510-0500 DESCRIPTION OF WORK AND CONSTRUCTION SCHEDULE The Subcontractor shall furnish all labor, materials, transportation, overhead, insurance, bonding costs, safety oversight, quality control oversight, supervision, and equipment necessary to perform the work described in the Statement of Work entitled, "P-F3 to P-F4 15 KV Cable Install, Project 3-7-103B" dated November 3, 2025 and Drawing Set entitled "P-F3 to P-F4, 15KV Cable Installation, Project No. 3-7- 103B, dated October 2025, Specification Sections 010010 - General Requirements (March 2025), Section 013100 FRA Environment, Safety, and Health Requirements (April 2025), Section 013300 - Submittals (January 2025), Section 014100 - Quality Requirements (October 2025), mentioned therein, which the specifications, drawings, and other documents are attached to and hereby made a part of this Solicitation.

Sub-Bidding

Communication

$100,000.00

Public - Federal

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
453
Active Projects
243
Bidding Soon
3,319
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2025

January 12, 2026

Project location map

Multiple Locations, Wheaton, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.