BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 13, 2026 at 7:00 PM

Updated February 16, 2026

Remodeling of a clubhouse / community center in Wheaton, Illinois. Completed plans call for the remodel of a clubhouse / community center.

2026 Ray Morrill Community Center Interior Remodel - Phase 3 The Wheaton Park District Board of Park Commissioners reserves the right to waive all technicalities, to accept or reject any or all bids, to accept only portions of a proposal and reject the remainder without disclosure for any reason. Failure to make such a disclosure will not result in accrual of any right, claim or cause of action by any Bidder against the Wheaton Park District. All bid proposals must be accompanied by a bid bond or bank cashier's check payable to the Wheaton Park District for ten percent (10%) of the amount of the bid as provided in the Instructions to Bidders. No proposals or bids will be considered unless accompanied by such bond or check. Prior to beginning Work, the successful Bidder shall furnish a Performance Bond, and Labor and Materials/Payment Bond in the amount of 110% of the Contract Sum, using a form similar to the AIA-A312-2010 form, or its current equivalent, or one acceptable to Owner, cosigned by a surety company licensed to conduct business in the State of Illinois and with at least an "A" rating and a financial rating of at least "X" in the latest edition of the Best Insurance Guide. Said bond shall guarantee the faithful performance of the Work in accordance with the Contract, the payment of all indebtedness incurred for labor and materials, and guarantee correction of Work. The cost of each bond shall be included in the Contract Sum. The Bidder and all Subcontractors shall name the Park District as an obligee on all bonds. Said bonds shall meet the requirements of the Illinois Public Construction Bond Act, 30 ILCS 550/0.01 et seq. and any further amendments thereto. Bidder shall include in its Performance Bond and Labor and Material Payment Bond such language as shall guarantee the faithful performance of the Prevailing Wage Act as required in these Bid Documents. Substantial Completion: Phase 3A - Corridors, Appleby Kitchen, Lobby/Atrium and Admin Areas: April 10, 2026 Phase 3B - Base Bid and/or Alternate Bid Gymnasium Renovations: May 22, 2026 Phase 3C - Preschool Classrooms, and Balance of work to Corridors: August 14, 2026 Final Completion: Phase 3A - Corridors, Appleby Kitchen, Lobby/Atrium and Admin Areas: April 24, 2026 Phase 3B - Base Bid and/or Alternate Bid Gymnasium Renovations: June 5, 2026 Phase 3C - Preschool Classrooms, and Balance of work to Corridors: August 28, 2026 Selected renovations to certain main level spaces within the Ray Morrill Community Center building, including (but not necessarily limited to) flooring, walls, doors, plumbing, painting, casework and countertops, storage closets, and other miscellaneous improvements as set forth in the drawings, plans and specifications prepared by Williams Architects.

Award

Clubhouse / Community Centers

$3,263,090.00

Public - City

Remodeling

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
803
Active Projects
533
Bidding Soon
3,706
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2025

February 2, 2026

Project location map

1777 S Blanchard St, Wheaton, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.