Renovation of an industrial development in Wheaton, Illinois. Completed plans call for the renovation of a industrial development.
LP Fueled Liquid Cooled Industrial Level Generator DuPage County Emergency Telephone System Board ("ETSB") is seeking a bidder to furnish, deliver, install, connect, test, and commission a complete, ready-for-service 25 kW liquefied petroleum (LP) fueled, liquid-cooled, single-phase 120/240V industrial level generator including weather and sound enclosure, battery, battery charger, block heater, and all associated mechanical, fuel, and electrical connections; and a new 100A Automatic Switch Company (ASCO) 300 series single-phase 120/240V automatic transfer switch (ATS). Awarded bidder shall be responsible for furnishing all parts, labor and materials needed to complete the installation in conformance with the specifications. January 13, 2026 4:00 p.m. Questions due to Buyer via email: sara.rogers@dupagecounty.gov January 14, 2026 4:00 p.m. Final Q&AAddendum Published Location Radio Tower Standby Generator Hidden Lakes Forest Preserve Southside Butterfield Road Downers Grove, East of Route 53 Building #36 Engine o Liquid cooled, spark ignited engine designed for continuous standby duty on propane. o 25 kW standby rating at 60 Hz, 120/240V single phase. o Mechanical or electronic governor maintaining voltage and frequency within industry standby limits. o Radiator and fan sized for ambient operation up to 40C; thermostatic control. o Engine meets applicable local emissions and safety standards for stationary standby use. o Electric starting system with heavy duty starter and adequate battery capacity for cold starts. Alternator o Brushless synchronous, self-ventilated, single bearing or two-bearing as recommended by manufacturer. o Class H or F insulation for industrial duty. o Solid state AVR for +-1.0% steady state regulation under varying load. o 120/240V, single phase, 60 Hz, rated for 25 kW standby at 1.0 pf. o Overcurrent and short-circuit protection integrated with controller; anti-condensation heater or space heater if required. Cooling System o Heavy duty radiator with shroud and corrosion-resistant finish. o Factory filled with extended life coolant; fill and test on site. o Rated continuous operation to 40C (or specify higher if requested). Fuel System o LP gas (propane) ready configuration. o Provide LP regulator and first stage piping from generator to customer-supplied LP source; include flexible fuel connector and shutoff solenoid. Final tie-in to site tank and LP piping by others unless specified otherwise. o Excess flow protection, solenoid valve interlocked with controller for emergency shutdown, and compliance with local fuel codes. Transfer Switch o ASCO 300 Series 100A, 120/240V single phase automatic transfer switch. o Installed inside existing shelter on west side; mounted per manufacturer torque and clearances. o National Electrical Manufacturers Association (NEMA) enclosure for indoor use, load monitoring contact, manual/auto transfer capability, provisions for generator exercise control and signal wiring to genset controller. Wiring and Connections o Provide power cable sized for 100A continuous plus inrush, cored through west wall using a fire-rated core and watertight bulkhead fitting. Terminate to new transfer switch load side lugs. o Run multiconductor control cable between genset controller and ASCO transfer switch for common start/stop and status interlocks. Provide labeled, color coded wiring in conduit. o Connect generator frame to site grounding system per National Electrical Code (NEC); provide isolated neutral or bonded neutral per system requirements and coordinate with site electrical engineer. o All feeders run in rigid or Electrical Metallic Tubing (EMT) conduit as required; support clamps and cable strain relief at penetrations. Controls and Instrumentation o Digital controller with auto/manual/remote start, runtime meter, oil pressure, coolant temp, battery voltage, frequency, voltage meters, event and fault logs, programmable inputs/outputs, and remote annunciation contacts. o High coolant temp, low oil pressure, overspeed, overcurrent, low battery, emergency stop. o Ethernet/serial remote monitoring port or cellular gateway ready interface for future remote telemetry. o Local mimic panel and display with pushbuttons for start/stop, lamp test, and fault reset. Battery, Charger, and Heater o Maintenance free lead-acid battery sized and installed per manufacturer recommendations for engine starting and system reliability at site minimum temperature. o Float/charge automatic charger sized for battery bank, with AC input breaker and status indicator. Temperature compensation optional. o 120 VAC or 240 VAC block heater rated to maintain engine startability in cold weather; thermostatically controlled and wired to a dedicated circuit or shelter power. Mechanical Installation o Concrete pad with anchor bolts; generator baseplate bolted to pad using vibration isolators. o Coordinate penetration location and routing with site; provide flexible exhaust connector and slip joints to isolate vibration. o Provide drip pans and secondary containment where required by local code.
Post-Bid
Industrial
$200,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 22, 2026
January 30, 2026
Multiple Locations, Wheaton, IL
Related To This Project
Wheaton, IL
Bid Date: Dec 17 2025
Wheaton, IL
Bid Date: Jan 08 2026
Wheaton, IL
Bid Date: Jan 07 2026
Wheaton, IL
--
Wheaton, IL
Bid Date: Jan 29 2026
Wheaton, IL
Bid Date: Jan 27 2026
Wheaton, IL
Bid Date: Jan 26 2026
Wheaton, IL
Bid Date: Jan 29 2026
Wheaton, IL
Bid Date: Jan 06 2026
Wheaton, IL
Bid Date: Dec 18 2025
Wheaton, IL
Bid Date: Nov 21 2025
Wheaton, IL
--
Wheaton, IL
--
Wheaton, IL
Bid Date: Dec 11 2025
Wheaton, IL
Bid Date: Dec 17 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.