BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 13, 2025 at 7:00 PM

Updated November 14, 2025

This is a service / maintenance or supply contract in Reynoldsville, Pennsylvania. Contact the soliciting agency for additional information.

Initiating Organization: Engineering District 9-0 Agreement Type: Project Specific 100% State Funded: No Services Requested: Design and Misc Services E06520 SR 1027 (01B) over Beaver Creek Bridge Replacement E06521 SR 3013 (01B) over Cole Trout Run Bridge Replacement E06522 PA 164 (15B) over South Dry Run Bridge Part Name: SR 164-15B South Dry Run Bridge - PE Project Description: Preliminary engineering for the bridge replacement of SR 164-15B (Dunnings Highway) over South Dry Run in Freedom Township, Blair County (BMS 07 0164 0222 0374) Services for this part will include, but are not limited to the following: Environmental Studies: The project team will be responsible for the preparation of the CEE and all investigations and public involvement required to obtain the necessary National Environmental Policy Act (NEPA) approval including Wetland Identification and Mitigation and Hazardous and Residual Waste Site Assessmet. Preliminary Engineering Services: Field Surveys, Hydrologic and Hydraulic Study, Waterway Permits, Erosion and Sedimentation Control Plan, Type, Size, and Location Study; Preliminary Geotechnical Engineering Report; Preliminary Right of Way Activities, Utility Investigation, Preliminary Drainage Design, Safety Review/ Audit; Preliminary Traffic Control Plan, Preliminary Pavement Design/Cores, Typical Sections; Cross Sections, Design Field View, Railroad Coordination, Project Scheduling and Project Management and Coordination. Anticipated NTP: July 2026 Project Time: Day Time Blair County 0164/15B Part Name: SR 164-15B South Dry Run Bridge - FD Project Description: Final Design for the bridge replacement of SR 164-15B (Dunnings Highway) over South Dry Run in Freedom Township, Blair County (BMS 07 0164 0222 0374) Services for this part will include, but are not limited to the following: Supplemental Field Surveys, Utility Coordination, Right-of-Way Activities, Final Roadway Design Plans, Cross Sections, Specifications, Cost Estimate, Final Foundation Design, Final Structure Design, Railroad Coordination, Project Scheduling, Final Constructability Meeting, Project Management and Coordination, Final Traffic Control Plans, Final Plan Checks, and assembly of the project documents. Anticipated NTP: July 2028 Project Time: Day Time Location Description State Route/Section Blair County 0164/15B Part Name: SR 164-15B South Dry Run Bridge - CC Project Description: Construction Support Services for the bridge replacement of SR 164-15B (Dunnings Highway) over South Dry Run in Freedom Township, Blair County (BMS 07 0164 0222 0374) Services for this part will include, but are not limited to the following: Shop Drawing Review and Consultation during Construction. Anticipated NTP: July 2029 Project Time: Day Time Location Description State Route/Section Blair County 0164/15B Part Name: SR 164-15B South Dry Run Bridge - OAA Project Description: The effort under this task is for additional meetings, analysis and design activities as directed. Anticipated NTP: 10/1/27 Project Time: Day Time The Department will establish an order of ranking of a minimum of (3 ) firms for the purpose of negotiating agreements based on the Department's evaluation of the statements of interest received in response to this solicitation. The final ranking will be established directly from the statements of interest. Technical proposals will not be requested prior to the establishment of the final ranking. The goal for Disadvantaged Business Enterprise (DBE) participation in this agreement shall be 0 of the total agreement cost. Cost included in a DBE firm's price proposal as direct cost of work and services by others shall not count as DBE participation in this agreement, unless completed by a DBE firm. Additional information concerning DBE participation in this agreement is contained in the General Requirements and Information Section referenced below. Special Comments The District will establish an order of ranking of five (5) firms from one (1) State of Interest discussing only the PA 164 over South Dry Run of agreement E06522. The top five (3) firms will each be ranked 1st per Bridge Agreement. The 4th and 5h ranked firms will become #2 and #3 under each agreement. The Department will assume a firm is interested in each agreement. If a firm is not interested in one of the agreements, then this should be clearly stated. The anticipated date of selection for this agreement is 1/14/2026, with a NTP for Preliminary Engineering phases anticipated 4/1/2026. The method of contractor selection has not been determined at this time. PADOT - RFQ - SR 1027 (01B) over Beaver Creek Bridge Replacement

Conceptual

Bridges / Tunnels

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
95
Bidding Soon
1,318
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2026

Project location map

Multiple Locations, Reynoldsville, PA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.