Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 18, 2025 at 7:00 PM
Updated December 19, 2025
Site work and new construction of a water / sewer project in Greenwood, Missouri. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
The Project consists of the following Work: Twelve (12) permanent meters including ten (10) new structures and two (2) existing structures. o Dikeland Meter Structure - new construction o Greenwood - 21st Ave Meter Structure - new construction o Greenwood - Big Creek Meter Structure - existing structure with new equipment o Lake Winnebago - Dam Meter Structure - new construction o Raintree Pump Station Meter Structures - three new structures at existing facility o Lees Summit - Big Creek Meter Structure - existing facility and new equipment o Lees Summit - Saddlebrook Meter Structure - new construction o Mullendike Meter Structure - new construction o Pleasant Hill - Benton Street Meter Structure - new construction o Raymore - Alexander Creek Meter Structure - new construction Questions should be directed to Eric Farrow at eric.farrow@hdrinc.com and Bill Perkins at BPerkins@lbvsd.org. The Little Blue Valley Sewer District is an Equal Opportunity Employer and invites the submission of bids from Disadvantaged Business Enterprises (DBE). In accordance with the Standard Federal Equal Employment Opportunity Construction Contract Specifications (Executive Order 11246), participation goals for Minority Business Enterprise (MBE) and Women's Business Enterprise (WBE) for the Project shall be 12.7 percent (12.7%) and 6.9 percent (6.9%) respectively. The Little Blue Valley Sewer District (referred to as the "District") reserves the right to reject any and all bids, to waive technical defects in bids, and to select the bid(s) deemed most advantageous to the District. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Eric Farrow at Eric.Farrow@hdrinc.com. Question Deadline 12/09/2025 Project no- 130546
Bid Results
Water / Sewer
$5,264,030.00
Public - County
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
