Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 24, 2025 at 7:00 PM
Updated December 5, 2025
Site work, paving and outdoor lighting for a mixed-use development in Severance, Colorado. Completed plans call for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
Reference Number 0000404411 The Town of Severance is planning for further development of Severance Community Park, a new park located approximately one mile south of downtown. This new phase of the park's development is envisioned as a space to host community events and support the vibrant culture of Severance. The concept and 30% design for the park have been reviewed and approved by the Town, and the design is being progressed toward final design. A significant portion of the existing park, including existing sporting fields and an existing playground, shall remain open to the public during the spring and summer sports seasons, unless otherwise approved in writing by the Town. At no time shall access to the existing fields or paved parking lots be hindered or obstructed. The 6.5 acre site is planned to include the following features/amenities: o 2 shade structures, one with plumbed restroom facilities o 2 HMA parking lots o 4 Pickleball courts o UC Health fitness court o Playground o 2 Soccer fields o Outdoor game/activity courts/areas o Landscape improvements o Streetscape improvements o Site utilities including electrical service, water service, sanitary service, lighting, stormwater, and an extension of the existing irrigation system o Maintain irrigation to all existing landscape areas that are to remain Question Deadline 11/24/2025 at 2:00 PM MT Questions are submitted online Yes, Interested contractors may direct all questions and inquiries relating to this RFP to Jessica Nielson at NielsonJ@AyresAssociates.com. Responses to questions will be posted by the Town as an addendum to online by 5pm on November 26, 2025. ANTICIPATED SCHEDULE The design phase is underway with the initial earthwork construction package (CP) anticipated to be released in late December 2025. Construction is anticipated to begin in January 2026. The schedule for the remainder of the park work will be developed in conjunction with the CM/GC. The project must be completed by August 8, 2026. Based on the design work to date, the Town is anticipating a construction cost of between $4.5 million and $5 million. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Project includes the following Work: PARKING LOT CONSTRUCTION, SIDEWALK CONSTRUCTION, PICKLEBALL COURT CONSTRUCTION, UCHEALTH FITNESS AREA CONCRETE SLAB CONSTRUCTION, PLAYGROUND AREA INSTALLATION, RESTROOM STRUCTURE INSTALLATION, SHELTER STRUCTURE INSTALLATION, CONCRETE PLAZA CONSTRUCTION, SOD AND LANDSCAPING INSTALLATION, INCLUDING SOCCER FIELD INSTALLATION, WATER SERVICE INSTALLATION, SANITARY SERVICE INSTALLATION, IRRIGATION INSTALLATION, ELECTRICAL INSTALLATION, STORM INFRASTRUCTURE AND ASSOCIATED WORK INCLUDING REMOVALS, EARTHWORK, GRADING, ASPHALT PATCHING, SIGNAGE INSTALLATION, PAVEMENT MARKING APPLICATION, DRAINAGE IMPROVEMENTS, AND AMENITY INSTALLATION.
Post-Bid
Playgrounds / Parks / Athletic Fields
$5,000,000.00
Public - City
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 4, 2025
August 4, 2026
100 Waterfowl Wy, Severance, CO
Related To This Project
Severance, CO
Bid Date: Nov 06 2025
Severance, CO
Bid Date: Sep 29 2025
Severance, CO
Bid Date: Aug 12 2024
Severance, CO
Bid Date: Nov 28 2023
Severance, CO
Bid Date: Nov 02 2023
Severance, CO
Bid Date: Mar 24 2023
Severance, CO
Bid Date: Nov 02 2021
Severance, CO
Bid Date: Nov 22 2023
Severance, CO
Bid Date: Jun 02 2023
Severance, CO
Bid Date: May 08 2023
Severance, CO
Bid Date: Apr 25 2023
Severance, CO
Bid Date: Apr 12 2023
Severance, CO
Bid Date: Mar 10 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
