Published January 29, 2026 at 7:00 PM
Updated January 30, 2026
Renovation of a data center facility in Salt Lake City, Utah. Completed plans call for the renovation of a data center facility.
**As of January 29th, 2026, this project has not yet been awarded. A timeline for the award has not yet been established.** Reference Number 0000404468 Question Deadline 12/02/2025 at 4:00 PM MT Questions are submitted online Yes, Bidding Questions: 1-800-835-4603, Option 2 or support@bidnet.com Remodel the existing kitchen / patient service space to accommodate updated service line. This only includes phase 4 work. Existing equipment to be disconnected and removed. Install new kitchen equipment & modify layout. See the attached drawings, specifications, & phasing plan. he existing facility (Bldg. 522) will be operational and occupied during the design and construction. Therefore, ensuring infection control, cleanliness, noise control, and patient safety in an active hospital is critical to the success of the project. Advance notice and P.A.C.E. plan coordination with staff for utility shutdowns, site access, and field investigation will be required. Additionally, the existing conditions and complex infrastructure can vary from the as-built records. Contractor must meet the minimum mandatory requirements and complete checklist (shown on attachment). The existing facility (Bldg. 522) will be operational and occupied during the construction. Therefore, ensuring infection control and patient safety in an active hospital is critical to the success of the project (i.e. use of HEPA carts required while investigating above ceilings of sensitive areas). Advance notice and PACE plan coordination with staff for utility shutdowns, site access, and field investigation will be required. Additionally, the existing conditions and complex infrastructure can vary from the as-built records. The liquidated damages will be set at $150/day and the substantial completion date is May 1, 2026. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % The University of Utah reserves the right to reject any or all bids or to waive any formality or technicality in any bid in the interest of the University.
Post-Bid
Data Centers
$500,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 22, 2025
January 21, 2026
50 Medical Dr N, Salt Lake City, UT
Related To This Project
Salt Lake City, UT
Bid Date: Nov 21 2025
Salt Lake City, UT
Bid Date: Feb 04 2026
Salt Lake City, UT
Bid Date: Nov 25 2025
Salt Lake City, UT
Bid Date: Dec 08 2025
Salt Lake City, UT
Bid Date: Dec 17 2025
Salt Lake City, UT
Bid Date: Dec 05 2025
Salt Lake City, UT
Bid Date: Nov 15 2025
Salt Lake City, UT
Bid Date: Dec 19 2025
Salt Lake City, UT
--
Salt Lake City, UT
Bid Date: Nov 28 2025
Salt Lake City, UT
--
Salt Lake City, UT
Bid Date: Nov 26 2025
Salt Lake City, UT
Bid Date: Nov 26 2025
Salt Lake City, UT
--
Salt Lake City, UT
Bid Date: Feb 06 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.