Renovation of a data center facility in Salt Lake City, Utah. Completed plans call for the renovation of a data center facility.

**As of January 29th, 2026, this project has not yet been awarded. A timeline for the award has not yet been established.** Reference Number 0000404468 Question Deadline 12/02/2025 at 4:00 PM MT Questions are submitted online Yes, Bidding Questions: 1-800-835-4603, Option 2 or support@bidnet.com Remodel the existing kitchen / patient service space to accommodate updated service line. This only includes phase 4 work. Existing equipment to be disconnected and removed. Install new kitchen equipment & modify layout. See the attached drawings, specifications, & phasing plan. he existing facility (Bldg. 522) will be operational and occupied during the design and construction. Therefore, ensuring infection control, cleanliness, noise control, and patient safety in an active hospital is critical to the success of the project. Advance notice and P.A.C.E. plan coordination with staff for utility shutdowns, site access, and field investigation will be required. Additionally, the existing conditions and complex infrastructure can vary from the as-built records. Contractor must meet the minimum mandatory requirements and complete checklist (shown on attachment). The existing facility (Bldg. 522) will be operational and occupied during the construction. Therefore, ensuring infection control and patient safety in an active hospital is critical to the success of the project (i.e. use of HEPA carts required while investigating above ceilings of sensitive areas). Advance notice and PACE plan coordination with staff for utility shutdowns, site access, and field investigation will be required. Additionally, the existing conditions and complex infrastructure can vary from the as-built records. The liquidated damages will be set at $150/day and the substantial completion date is May 1, 2026. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % The University of Utah reserves the right to reject any or all bids or to waive any formality or technicality in any bid in the interest of the University.

Post-Bid

Data Centers

$500,000.00

Public - State/Provincial

Renovation

97

10

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
175
Active Projects
96
Bidding Soon
975
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 22, 2025

January 21, 2026

Project location map

50 Medical Dr N, Salt Lake City, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.