BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 12, 2025 at 7:00 PM

Updated December 13, 2025

Site work and paving for a mixed-use development in Portland, Oregon. Completed plans call for site work for a transportation facility; for paving for a transportation facility; and water / sewer project.

A. The work includes but is not limited to 1. Reconstruction of Taxiway K from the Taxiways T and K intersection to west of Exit A6. The work includes providing centerline and edge lighting cans, conduits and conductors, signage, storm drainage improvements, site grading, and pavement markings. 2. Rehabilitation of Taxiway E from the Taxiways A and E intersection to the Runway 10L--28R hold bar. The work includes removing and resetting lighting, and providing centerline cans, conduits and conductors, signage, and pavement markings. B. The existing state prevailing rate of wage and, if applicable, the federal prevailing rate of wage required under the Davis-Bacon Act (40 USC 3141 et seq.) apply to this work. See the contract documents for more information. C. The work will require the Contractor, its employees, and subcontractors to obtain and display security identification badges. D. Plan and perform the work in accordance with the following restrictions: 1. Exhibit A ñ Construction Safety and Phasing Plan (CSPP) 2. Exhibit B ñ Environmental Management Plan The work includes but is not limited to 1. Reconstruction of Taxiway K from the Taxiways T and K intersection to west of Exit A6. The work includes providing centerline and edge lighting cans, conduits and conductors, signage, storm drainage improvements, site grading, and pavement markings. 2. Rehabilitation of Taxiway E from the Taxiways A and E intersection to the Runway 10L-28R hold bar. The work includes removing and resetting lighting, and providing centerline cans, conduits and conductors, signage, and pavement markings. AIP#s: 3-41-0048-104 & 3-41-0048-105 Project Type Bid Response Types Line Items General Attachment (required) Type of Award Lump Sum. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00%. Online Q&A Yes Q&A Deadline 12/04/2025 5:00 PM (PST). Reconstruction of Taxiway K from the Taxiways T and K intersection to west of Exit A6. The work includes providing centerline and edge lighting cans, conduits and conductors, signage, storm drainag e improvements, site grading, and pavement markings. Rehabilitation of Taxiway E from the Taxiways A and E intersection to the Runway 10L-28R hold bar. The work includes removing and resetting lighting, and providing centerline cans, conduits and conductors, signage, and pavement markings.

Bid Results

Transportation Terminals

$6,297,840.00

Public - City

Paving, Site Work

199

54

2

7

Subscribe For Documents

81 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
65
Bidding Soon
961
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.