Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 12, 2025 at 7:00 PM
Updated December 13, 2025
Site work and paving for a mixed-use development in Portland, Oregon. Completed plans call for site work for a transportation facility; for paving for a transportation facility; and water / sewer project.
A. The work includes but is not limited to 1. Reconstruction of Taxiway K from the Taxiways T and K intersection to west of Exit A6. The work includes providing centerline and edge lighting cans, conduits and conductors, signage, storm drainage improvements, site grading, and pavement markings. 2. Rehabilitation of Taxiway E from the Taxiways A and E intersection to the Runway 10L--28R hold bar. The work includes removing and resetting lighting, and providing centerline cans, conduits and conductors, signage, and pavement markings. B. The existing state prevailing rate of wage and, if applicable, the federal prevailing rate of wage required under the Davis-Bacon Act (40 USC 3141 et seq.) apply to this work. See the contract documents for more information. C. The work will require the Contractor, its employees, and subcontractors to obtain and display security identification badges. D. Plan and perform the work in accordance with the following restrictions: 1. Exhibit A ñ Construction Safety and Phasing Plan (CSPP) 2. Exhibit B ñ Environmental Management Plan The work includes but is not limited to 1. Reconstruction of Taxiway K from the Taxiways T and K intersection to west of Exit A6. The work includes providing centerline and edge lighting cans, conduits and conductors, signage, storm drainage improvements, site grading, and pavement markings. 2. Rehabilitation of Taxiway E from the Taxiways A and E intersection to the Runway 10L-28R hold bar. The work includes removing and resetting lighting, and providing centerline cans, conduits and conductors, signage, and pavement markings. AIP#s: 3-41-0048-104 & 3-41-0048-105 Project Type Bid Response Types Line Items General Attachment (required) Type of Award Lump Sum. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00%. Online Q&A Yes Q&A Deadline 12/04/2025 5:00 PM (PST). Reconstruction of Taxiway K from the Taxiways T and K intersection to west of Exit A6. The work includes providing centerline and edge lighting cans, conduits and conductors, signage, storm drainag e improvements, site grading, and pavement markings. Rehabilitation of Taxiway E from the Taxiways A and E intersection to the Runway 10L-28R hold bar. The work includes removing and resetting lighting, and providing centerline cans, conduits and conductors, signage, and pavement markings.
Bid Results
Transportation Terminals
$6,297,840.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 11, 2025
May 4, 2026
7000 NE Airport Way, Portland, OR
Related To This Project
Portland, OR
Bid Date: Dec 18 2025
Portland, OR
--
Portland, OR
--
Portland, OR
--
Portland, OR
--
Portland, OR
Bid Date: Jan 16 2026
Portland, OR
Bid Date: Dec 02 2025
Portland, OR
Bid Date: Dec 11 2025
Portland, OR
Bid Date: Nov 18 2025
Portland, OR
--
Portland, OR
Bid Date: Dec 04 2025
Portland, OR
--
Portland, OR
--
Portland, OR
--
Portland, OR
Bid Date: Dec 17 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
