BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 23, 2025 at 7:00 PM

Updated December 24, 2025

Site work and paving for a sidewalk / parking lot in Gainesville, Florida. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Counties: Alachua Road Name: Maintenance sidewalk repairs in Alachua and Bradford Co Limits: Midpoint Project(s): 41021347281(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Contract Days: 180 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 00 Days (acq. time) Description: The improvements under this work document driven contract consist of removal and replacement of concrete sidewalks, driveways, and sidewalk curb ramps as listed in the bid items within the state maintained right of ways in Alachua County. Mobilization, Maintenance of Traffic and removal of undesirable materials such as tree roots encountered during sidewalk removal will be incidental to the pay items listed. Question Deadline 12/10/2025 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - 003 - Removal and Replacement of Concrete Sidewalks, Driveways, and Sidewalk Curb Ramps

Bid Results

Sidewalks / Parking Lot

$209,325.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
214
Active Projects
105
Bidding Soon
1,481
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2025

December 29, 2025

Project location map

Multiple Locations, Gainesville, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.