BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 10, 2025 at 7:00 PM

Updated December 13, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Central Hettinger, North Dakota. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Proposed Work Consists of 0.1700 Miles of Structure Replacement, Grading & Incidentals Located 106th Ave Sw, 2 Mi N and 3 Mi W of Regent And Involves Approximately: 1 L Sum Contract Bond; 1 L Sum Clearing & Grubbing; 1 L Sum Removal of Structure; 1 L Sum Remove Aggregate Base & Surfacing; 49 Lf Removal of Pipe All Types and Sizes; 454 Lf Remove Existing Fence; 5080 Cy Common Excavation-type a; 1096 Cy Topsoil; 3643 Cy Borrow-excavation; 1 L Sum Class 1 Excavation; 1 L Sum Class 2 Excavation; 1 L Sum Channel Excavation; 1 Ea Foundation Preparation; 147 M Gal Water; 3 Acre Seeding Class Ii; 3 Acre Temporary Cover Crop; 5 Acre Straw Mulch; 2437 Cy Riprap Grade Ii; 1852 Lf Fiber Rolls 12in; 1544 Lf Remove Fiber Rolls 12in; 75 Lf Flotation Silt Curtain; 75 Lf Remove Flotation Silt Curtain; 16.1 Ton Aggregate Base Course Cl 5; 1891 Ton Aggregate Surface Course Cl 13; 161 Cy Class Aae-3 Concrete; 307 Cy Class Ae-3 Concrete; 534 Sy Penetrating Water Repellent Treatment; 587 Lf Prestressed I-beam-36in; 44548 Lbs Reinforcing Steel-grade 60; 40165 Lbs Reinforcing Steel-grade 60-epoxy Coated; 4472 Lbs Structural Steel M270-grade 36; 42 Ea Steel Hpiling Points 12 X 53; 1570 Lf Steel Piling Hp 12 X 53; 220 Lf Steel Test Piling Hp 12 X 53; 300 Lf Traffic Rail-steel; 1 L Sum Mobilization; 216 Unit Traffic Control Signs; 6 Ea Type Iii Barricade; 10 Ea Delineator Drums; 68 Sy Geosynthetic Material Type G; 2877 Sy Geosynthetic Material Type Rr; 52 Sy Perforated Geocell; 110 Lf Pipe Conduit 18in-approach; 4 Ea Reset Sign Panel; 4 Ea Reset Sign Support; 5 Ea Remove Sign Foundation; 194 Lf W-beam Guardrail; 4 Ea Energy Absorbing Terminal; 1 L Sum Dewatering; 2 Ea Abutment Underdrain System. Bid Range $2,500,001 to $3,000,000 Time July 17, 2026 Prequalification is required for all bidders submitting a bidding proposal form. Prequalification is required annually. Prequalified contractors who wish to renew their prequalification must submit a complete "Contractor's Prequalification Statement" by July 1 of each calendar year. Bidders who are not currently prequalified must submit a complete "Contractor's Prequalification Statement" at least 10 business days prior to the date of the bid opening. Information is available from the Construction Services Division of the North Dakota Department of Transportation. Contractor's License--A contractor is not required to have a license from the state of North Dakota before bidding on any project, however, no contract will be awarded unless said contractor holds a current North Dakota license in the class within which the value of the contract falls. Contractors are required to meet the provisions of the Contract Work Hours and Safety Standards Act on the federal aid projects, are required to meet the Fair Labor Standards Act on all projects, and are required to pay any minimum wage rates set forth in the proposal form. A bid guarantee is required by Section 24-02-20, NDCC. The bid guarantee may be a bid bond equal to 10 percent of the full amount of the bid or a cashier's check of the bidder on a solvent bank equal to 5 percent of the bid. Bid bond shall be on the department form SFN 14196. Prior arrangements may be made with the department to file bid guarantees in advance. The Department of Transportation and all bidders are obligated to affirmatively ensure that in any contract entered into pursuant to this advertisement, minority or women's business enterprises will be afforded a full opportunity to participate and to submit bids in response to this invitation and will not be discriminated against on the grounds of race, religion, color, sex, age, or national origin in consideration for an award. Where applicable the contractor must fulfill all special provision requirements for utilization of Disadvantaged Business Enterprises. The right is reserved to reject any and all proposals, to waive technicalities, or to accept such as may be determined to be for the best interests of the state. NDDOT - 23713 - Structure Replacement, Grading & Incidentals - 106th Ave *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Bridges / Tunnels

$3,000,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

128

12

15

4

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
8
Bidding Soon
67
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2025

February 10, 2026

Project location map

106th Ave SW, Central Hettinger, ND


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.