Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 11, 2026 at 7:00 PM
Updated February 13, 2026
Site work and new construction of a municipal facility in Bradford, Ontario. Completed plans call for the construction of a 107,735-square-foot, four-story above grade municipal facility; and for site work for a municipal facility.
The Design-Builder is responsible for all activities associated with completion of the Construction Documents through to construction completion, including building takeover, project closeout and warranty obligations as set forth in the contract documents. The Design-Builder will manage the project, overseeing both the design and construction of the facility, and coordination of all consultant services. The Design-Builder shall assemble a team, whether in-house or via subconsultants, to provide comprehensive and multi-disciplinary services complete with expertise in the following disciplines, but not limited to: (a) Architectural (b) Structural (c) Mechanical (d) Electrical (e) Civil and Stormwater (f) Theatre (g) Landscape Architecture (h) Code Compliance (i) Commissioning and Functional Testing (j) Transportation (k) Signage and Wayfinding (l) Sustainability (m) Acoustics The Deliverables are confined by a committed fixed budget and related funding with no tolerance or opportunity to exceed secured funding or to erode highest quality design standards. The total estimated design-build budget is $83,947,000 and is intended to account for all project related costs such as allowances, project management, overhead & profit, as well as design and construction costs; however, HST, utility connections and moving costs are excluded. Start of Construction: Q2/Q3 2026 Substantial Completion: April 28, 2028 Total Completion: June 5, 2028 Documents can be obtained at: https://townofbwg.bidsandtenders.ca Question Deadline: Tue Jan 20, 2026 4:00:00 PM (EST)
Post-Bid
Municipal
$83,947,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 12, 2026
April 13, 2026
125 Simcoe Rd, Bradford, ON
Related To This Project
Bradford, ON
--
Bradford, ON
Bid Date: Jan 27 2026
Bradford, ON
Bid Date: Feb 12 2026
Bradford, ON
Bid Date: Feb 17 2026
Bradford, ON
Bid Date: Feb 10 2026
Bradford, ON
Bid Date: Feb 24 2026
Bradford, ON
Bid Date: Feb 19 2026
Bradford, ON
--
Bradford, ON
Bid Date: Aug 07 2025
Bradford, ON
Bid Date: Jul 30 2025
Bradford, ON
Bid Date: Jul 11 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
