BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 22, 2025 at 7:00 PM

Updated December 23, 2025

Site work for a development in Montgomery Center, Vermont. Completed plans call for site work for a conservation development.

This project proposes to improve water quality and increase flood resilience in Montgomery, VT, via floodplain lowering and buffer plantings along the confluence of Black Falls Brook and the Trout River. The design includes excavation of approximately 4.5 acres, with an estimated total sediment removal of 29,000 cubic yards. Due to the project site's proximity to Route 118 and a nearby bridge, implementation will include road embankment stabilization, bridge scour protection, and coordination with the Vermont Agency of Transportation. Final design will include a VTrans Scour Analysis. Special instructions: Please contact info@franklincountynrcd.org for the bid documents, which include a detailed RFP, project and site descriptions, and preliminary design.

Post-Bid

Conservation and Development

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
326
Active Projects
125
Bidding Soon
2,323
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2025

February 2, 2026

Project location map

To be determined, Montgomery Center, VT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.