BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 22, 2026 at 7:00 PM

Updated January 23, 2026

Site work for a transportation facility in Halndle Bch, Florida. Completed plans call for site work for a one-story above grade transportation facility.

Question Deadline 12/08/2025 at 5:00 PM ET The City of Hallandale Beach is seeking bids from qualified firms to provide ADA compliant ramp installation services for use by the City of Hallandale Beach Public Works Department. The project involves the new installation of ADA compliant ramps to ensure safe, independent access for all users, compliance with ADA standards, and improved pedestrian safety. Respondents must submit all proposal documents electronically through the specified website. Minimum qualification requirements must be met for a bid to be considered responsive. Firms must provide a bid bond in the amount of ten percent of the project total with the submission, and proof of 100% of total contract bonding capacity is required. The awarded contractor must submit performance and labor materials payment bonds no later than fifteen days after notification of the award. THE REQUIREMENT A. The work to be performed under this Contract shall consist of furnishing all tools, equipment, materials, supplies, and manufactured articles and for furnishing all transportation and services, including fuel, power, water, and essential communications, and for the performance of all labor, work, or other operations required for the fulfillment of the Contract in strict accordance with the Contract Documents. The work shall be complete, and all work, materials, and services not expressly shown or called for in the Contract documents, which may be necessary for the complete and proper construction of the work, in good faith, shall be performed, furnished, and installed by the Contractor as though originally so specified or shown, at no increase in cost to the City. All work must comply with the latest ADA standards. B. Prior to construction, the Contractor shall verify existing conditions identified on the Drawings and locate the elements used to tie the location of the concrete pads. Any discrepancy must be discussed with the EOR and/or the City. C. The work to be performed includes site, and civil work associated with the construction of the 25 bus stops shown in the City-wide ADA Compliant Bus Stops Project plans, in the City of Hallandale Beach. D. Work shall be performed to minimize impacts to roadway traffic, parking, residents and/or businesses. Any disruptions in the above shall be coordinated with the City in advance. E. It is the intent of the City of Hallandale Beach to obtain a complete and working installation under this contract and any items of labor, materials, or equipment, which may reasonably be assumed as necessary to accomplish this e and working installation under this contract and any items of labor, materials, or equipment, which may reasonably be assumed as necessary to accomplish this end, should be supplied whether or not specifically shown on the plans or described herein. LOCATION OF THE PROJECT A. The bus stops are located at the following sites in Hallandale Beach, Florida. B. LOCATION STOP# ATLANTIC SHORES B/NE 10 A R1-13 ATLANTIC SHORES B/NE 12 A R1-14 LAYNE BLVD/EGRET DR R1-21 ATLANTIC SHORES BLVD/NE 10 AVE R2-25 ATANTIC SHORES BLVD/ NE 8 AVE R2-26 SE 1ST AV./SE 3RD STREET R3-02 NE 1 A/NE 5 S (FASHION ROW PLAZA) 2 ROUTES STOP R3-07 NW 3 ST / NW 1 AVE (CHURCH OF CHRIST) R3-08 FOSTER ROAD (WEST OF Z MARKET)/ NW 3ED AVE. R3-09 NW 9 AVE/ NW 7 STREET R3-23 NW 8 AVE / NW 6 ST R3-24 NW 8 AVE / NW 2 STREET R3-25 SW 10 TERR / SW 10 AVE R3-29 SW 8 AVE SW 1ST STREET (INGALLS PARK) R3-31 SW 1 ST / SW 4 AVE (GULFSTREAM EARLY LEARNING CTR) R3-32 SW 3 STREET / SW 2 AVE (OLD FIRE STATION) R3-33 NW 10 AV/NW 10TH ST R4-02 FOSTER R/NW 8 TER R4-03 NW 3 ST AND NW 1 AVE R4-06GOLDEN ISLES /DIANA DRIVE R4-16 SW 3 S/SW 2 A R4-25 SW 1 S/SW 6 A R4-26 SW 2 CT/SW 8 A (INGALS PARK) R4-27 SW 8 A/SW 4 S R4-28 SW 10 S/SW 8 A R4-29 The estimated budget for this project is $442,779.76.

Post-Bid

Transportation Terminals

$442,780.00

Public - City

Site Work

58

15

2

7

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
253
Active Projects
118
Bidding Soon
1,681
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 5, 2026

February 4, 2026

Project location map

Multiple Locations, Halndle Bch, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.