Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 24, 2025 at 7:00 PM
Updated December 25, 2025
Site work for a mixed-use development in Vineyard, Utah. Completed plans call for site work for a playground / park / athletic field; and water / sewer project.
Questions Due Date: Dec 1st 2025, 5:00 PM MST All inquiries regarding the project or proposal requirements must be submitted through online The City of Vineyard invites qualified contractors to submit proposals for the Construction Contract known as the "Design-Construct Beach Volleyball Court at Lakefront Waterfront", located at approximately N 300 W and W Vineyard Loop Road, between N 300 W and the Utah Lake Shore Trail (Lat/Long: 4018'27.7"N 11145'46.4"W) in Vineyard, Utah 84059 (Attachment A 'Site Location Map'). The selected contractor would perform all design work, and furnish all labor, materials, equipment, and services necessary to construct one regulation-sized sand volleyball court (52.5' x 26.25', plus a 10 ft no-play, free zone for spectators around the play area) at the designated location. The work must conform to the specifications and drawings provided (Attachment D 'Site Construction Drawings') and all applicable codes and standards. The Work generally consists of, but is not limited to: o Site Preparation & Grading: Clear existing vegetation, rough-grade to subgrade elevations, and install erosion/sediment controls per the drawings. o Base & Drainage: Place and compact a 6" untreated base course and install the specified subsurface drainage system . o Sand Surfacing: Furnish and spread washed, natural sand to a minimum 12" depth across the court, meeting USAV competition standards. o Edging & Containment: Provide volleyball court boundaries with weather-resistant lines secured in place using plate anchors. Install concrete perimeter edging to retain the sand layer. Install a fence (minimum 3 feet tall) surrounding the sand volleyball court for the purposes preventing volleyballs from rolling onto the adjacent trail or Utah Lake, and deterring wildlife from entering the sand volleyball court. The intent is to provide court boundary definition without restricting public access to Utah Lake or impacting wildlife corridors. o Net System & Posts: Provide and install volleyball posts, anchors, and net, fully assembled and ready for play (work with Vineyard's Parks & Rec Director to finalize which volleyball court equipment to purchase). Site Amenities & Restoration: Connect an ADA-compliant concrete walkway to the existing path, and restore turf/landscaping in disturbed areas with a native seed mix (approved in advance by Vineyard City's Parks & Rec Director). Project construction is anticipated to commence in March 2026 and be completed by the end of April, 2026. Inquiries should be made to Brian Vawdry at brianv@vineyardutah.gov or (385) 240-6096. The City reserves the right to award the contract based solely on the initial proposals, with or without further discussions. Proposers are encouraged to submit their most competitive price and service offers. The City intends to enter a design-build contract as early as December 11th, 2025.
Post-Bid
Playgrounds / Parks / Athletic Fields
$100,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 3, 2025
March 2, 2026
To Be Determined, Vineyard, UT
Related To This Project
Vineyard, UT
--
Vineyard, UT
Bid Date: Dec 03 2025
Vineyard, UT
Bid Date: Nov 19 2025
Vineyard, UT
Bid Date: Mar 12 2021
Vineyard, UT
--
Vineyard, UT
Bid Date: Jul 31 2025
Vineyard, UT
Bid Date: Jul 31 2025
Vineyard, UT
Bid Date: Aug 26 2025
Vineyard, UT
--
Vineyard, UT
Bid Date: Jun 16 2025
Vineyard, UT
--
Vineyard, UT
Bid Date: Apr 23 2025
Vineyard, UT
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
