BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 8, 2025 at 8:00 PM

Updated August 9, 2025

Site work for a playground / park / athletic field in Vineyard, Utah. Working plans call for site work for a playground / park / athletic field.

The City of Vineyard invites qualified contractors to submit proposals for the Construction Contract known as the "Design-Construct Beach Volleyball Court at Lakefront Waterfront. Questions Due Date: Jul 21st 2025, 5:00 PM MDT The selected contractor would perform all design work, and furnish all labor, materials, equipment, and services necessary to construct one regulation-size sand volleyball court at Vineyard Grove Park. The work must conform to the specifications and drawings provided (Attachment D 'Site Construction Drawings') and all applicable codes and standards. The Work generally consists of, but is not limited to: o Site Preparation & Grading: Clear existing vegetation, rough-grade to subgrade elevations, and install erosion/sediment controls per the drawings . o Base & Drainage: Place and compact a 6" untreated base course and install the specified subsurface drainage system . o Sand Surfacing: Furnish and spread washed, angular sand to a minimum 12" depth across the court, meeting USAV competition standards. o Edging & Containment: Install perimeter edging (For example, you may provide bid estimates for either rubber or concrete options) to retain the sand layer. o Net System & Posts: Provide and install volleyball posts, anchors, and net-fully assembled and ready for play. o Site Amenities & Restoration: Add two player benches on concrete pads, connect an ADAcompliant walkway to the existing path, and restore turf/landscaping in disturbed areas. Project construction is anticipated to commence in August 2025. Vineyard City is experiencing rapid residential growth and is committed to expanding its recreational amenities to serve families, youth leagues, and casual park visitors alike. As part of our 2025 Parks & Recreation Master Plan, we seek a turnkey solution for a regulation-size sand volleyball court that will become a fun recreational area near the Utah Lake shoreline . The selected contractor will work closely with our Parks & Recreation and Public Works teams to deliver a facility that meets USA Volleyball (USAV) standards for competitive play, while also ensuring ADA-compliant access, long-term durability in Utah's climate, and minimal disruption to the park's existing irrigation, pathways, and landscaping. Questions regarding this RFP should be submitted in writing through U3P - Bonfire Interactive Portal or be directed to: Justine Marshall, Project Manager 125 S. Main Street Vineyard, Utah 84059 engineering@vineyardutah.gov Business Hours: M-Th 8am-5pm; F 8am-12Noon

Final Planning

Playgrounds / Parks / Athletic Fields

$260,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
194
Active Projects
109
Bidding Soon
1,283
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2025

February 8, 2026

Project location map

Multiple Locations, Vineyard, UT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.