Published November 26, 2025 at 7:00 PM
Updated December 5, 2025
Demolition, site work, renovation and addition to an educational facility in Farmington, Illinois. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.
Farmington School Additions & Renovations Sealed bids for multiple bid packages for the project consisting of several interior renovations throughout Farmington Central Schools. The work will start in January and will need to be completed by July of 2026. The bid packages included are as follows: BP 01 Site & Building Concrete, Site Demo and Earthwork BP 02 Structural/Misc. Steel Fabrication and Erection BP 03 Masonry BP 04 Doors Frames hardware (Materials Only) BP 05 Aluminum Windows, Doors, and Storefronts BP 06 General Trades & Demo BP 07 Framing, Drywall, Acoustical BP 08 Painting BP 09 Flooring BP 10 Fire Protection BP 11 - Plumbing BP 12 HVAC & Temp Controls BP 13 Electrical & Fire Alarm BP 14- Landscaping All technical bidding questions during the bidding period should be referred to Mike Lucas from MCP. All questions must be submitted in writing via email at mikelucas@midconpro.com by Tuesday, November 25 at 1:00 pm. All bids must be accompanied with bid security in the form of a bid bond, certified check or a cashier's check, made payable to Farmington CUSD #265 in the amount of five percent (5%) of the bid amount. The bidder shall, within said ten (10) days, provide a Performance and Payment Bond, with a Surety to be approved by the District, in the amount of 100% of the cost of the contract, the cost of which shall be included in the bid. The form of the Performance and Payment Bond is subject to approval of counsel for the District. Each bidder expressly agrees that such bid may not be withdrawn for a period of sixty (60) days from the opening thereof. Withdrawal within such period shall subject the bidder to forfeiture of Bid Bond, as well as penalties and damages to the District to the extent that such withdrawal results in loss to the District. The Work will include remodeling of the existing schools. The remodeling will include, but is not limited to, classrooms, breakout rooms, media center, cafeterias, serving areas, music room, music practice rooms, board room, toilet rooms, and the development of an outdoor learning space. The renovation of the existing school will include, but is not limited to, new interior walls, interior finishes, mechanical, plumbing, fire protection and electrical work. Site work and landscaping are also included. Coordinate Work with the Construction Manager's scope and bidding manual. The Board of Education reserves the right to reject any and all bids or any part thereof, to waive any informalities, errors or irregularity in bids received or in the bidding process, and to accept the bid that the Board of Education deems the most favorable to its interest after all bids have been examined and canvassed. The Board of Education will award the contract to the lowest responsible bidder that meets the criteria as established in the specifications and the contract will be awarded only after a formal notice is given to the successful bidder pursuant to action by the Board of Education. Questions: Email all questions to MCP Mike Lucas at mikelucas@midconpro.com
Post-Bid
Educational
$15,000,000.00
Public - City
Addition, Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 4, 2025
January 1, 2026
108 Lightfoot Rd, Farmington, IL
Related To This Project
Farmington, IL
Bid Date: Jun 02 2025
Farmington, IL
Bid Date: Mar 07 2025
Farmington, IL
Bid Date: Jan 07 2025
Farmington, IL
--
Farmington, IL
Bid Date: May 29 2024
Farmington, IL
Bid Date: Jun 16 2021
Farmington, IL
Bid Date: Apr 15 2020
Farmington, IL
Bid Date: Jul 28 2020
Farmington, IL
Bid Date: Oct 18 2019
Farmington, IL
Bid Date: May 25 2023
Farmington, IL
Bid Date: May 03 2023
Farmington, IL
Bid Date: Apr 12 2023
Farmington, IL
Bid Date: Feb 21 2023
Farmington, IL
Bid Date: Aug 31 2022
Farmington, IL
Bid Date: Feb 14 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.