BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 26, 2025 at 7:00 PM

Updated December 5, 2025

Demolition, site work, renovation and addition to an educational facility in Farmington, Illinois. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

Farmington School Additions & Renovations Sealed bids for multiple bid packages for the project consisting of several interior renovations throughout Farmington Central Schools. The work will start in January and will need to be completed by July of 2026. The bid packages included are as follows: BP 01 Site & Building Concrete, Site Demo and Earthwork BP 02 Structural/Misc. Steel Fabrication and Erection BP 03 Masonry BP 04 Doors Frames hardware (Materials Only) BP 05 Aluminum Windows, Doors, and Storefronts BP 06 General Trades & Demo BP 07 Framing, Drywall, Acoustical BP 08 Painting BP 09 Flooring BP 10 Fire Protection BP 11 - Plumbing BP 12 HVAC & Temp Controls BP 13 Electrical & Fire Alarm BP 14- Landscaping All technical bidding questions during the bidding period should be referred to Mike Lucas from MCP. All questions must be submitted in writing via email at mikelucas@midconpro.com by Tuesday, November 25 at 1:00 pm. All bids must be accompanied with bid security in the form of a bid bond, certified check or a cashier's check, made payable to Farmington CUSD #265 in the amount of five percent (5%) of the bid amount. The bidder shall, within said ten (10) days, provide a Performance and Payment Bond, with a Surety to be approved by the District, in the amount of 100% of the cost of the contract, the cost of which shall be included in the bid. The form of the Performance and Payment Bond is subject to approval of counsel for the District. Each bidder expressly agrees that such bid may not be withdrawn for a period of sixty (60) days from the opening thereof. Withdrawal within such period shall subject the bidder to forfeiture of Bid Bond, as well as penalties and damages to the District to the extent that such withdrawal results in loss to the District. The Work will include remodeling of the existing schools. The remodeling will include, but is not limited to, classrooms, breakout rooms, media center, cafeterias, serving areas, music room, music practice rooms, board room, toilet rooms, and the development of an outdoor learning space. The renovation of the existing school will include, but is not limited to, new interior walls, interior finishes, mechanical, plumbing, fire protection and electrical work. Site work and landscaping are also included. Coordinate Work with the Construction Manager's scope and bidding manual. The Board of Education reserves the right to reject any and all bids or any part thereof, to waive any informalities, errors or irregularity in bids received or in the bidding process, and to accept the bid that the Board of Education deems the most favorable to its interest after all bids have been examined and canvassed. The Board of Education will award the contract to the lowest responsible bidder that meets the criteria as established in the specifications and the contract will be awarded only after a formal notice is given to the successful bidder pursuant to action by the Board of Education. Questions: Email all questions to MCP Mike Lucas at mikelucas@midconpro.com

Post-Bid

Educational

$15,000,000.00

Public - City

Addition, Demolition, Renovation, Site Work

116

29

34

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
68
Bidding Soon
1,070
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2025

January 1, 2026

Project location map

108 Lightfoot Rd, Farmington, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.