BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 5, 2026 at 7:00 PM

Updated February 6, 2026

Renovation of a laboratory facility in Palo Alto, California. Completed plans call for the renovation of a laboratory facility.

Microbiology Lab Renovation includes the demolition and removal of existing laboratory components, including casework, finishes, and utilities, followed by the installation of new laboratory casework, countertops, sinks, and associated fixtures. The scope also involves upgrading mechanical, electrical, and plumbing systems to meet current standards for laboratory operations, including proper ventilation, exhaust systems, and utility connections. Work will include new flooring, wall finishes, ceiling systems, and lighting to create a modern, compliant laboratory environment. All construction activities must adhere to applicable codes, VA standards, and infection control requirements to ensure safety and functionality during and after renovation. The magnitude of construction is between $2,000,000 and $5,000,000. RFIS are due on: January 27, 2026, at 2:00 PM PST The Contractor shall begin performance within 10 calendar days and complete it within 360 calendar days. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Laboratories

$5,000,000.00

Public - Federal

Renovation

71

27

2

2

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
448
Active Projects
206
Bidding Soon
2,486
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2026

April 21, 2026

Project location map

3801 Miranda Ave, Palo Alto, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.