BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 1, 2025 at 7:00 PM

Updated December 2, 2025

Remodeling of an educational facility in Waterbury, Connecticut. Completed plans call for the remodel of a one-story above grade educational facility.

The services to be procured consist of: Gymnasium Floor and Bleacher Refinish & Tile Insert. Contact the Office of the Director of Purchasing, at 203-574-6748 for further information. Question Deadline 12/04/2025 at 2:00 PM ET All questions about the meaning or intent of the Bid Documents must be submitted electronically. Site Preparation _ Inspect the existing floor for damage: loose boards, water damage, excessive cupping, or separation. Replace damaged boards before sanding. _ Cover walls, vents, and nearby equipment to control dust. COVER NEWLY INSTALL HVAC EQUIPMET TO HELP WITH DUST CONTROL . A. Gymnasium Wood Floor and Bleacher Refinishing Sanding - Bringing Floor and Bleachers Back to Bare Wood _ Use professional drum or belt sanders with dust-control systems. _ Begin with a coarse grit (e.g., 36-40 grit) to remove old finish, scratches, and surface contamination. _ Progress to medium (60-80 grit) and then fine (100-120 grit) to achieve a smooth, even surface. _ Edge sanders and hand scraping should be used at perimeters, corners, and under bleachers. _ Screen/buff the entire surface with a 100-120 grit screen to blend sanding marks and open grain for sealer absorption. _ Vacuum thoroughly between passes; tack with microfiber cloths to remove all dust. Sealing the Floor and Bleachers _ Apply one coat of a penetrating sealer or gym floor sealer designed for wood athletic floors. _ Common choice: oil-modified polyurethane sealer or waterborne sealer (for faster cure and lower VOCs). _ Allow to dry fully, usually overnight (manufacturer's instructions). Court/Game Line Painting _ After sealer cures, lay out court markings per school specifications. _ Use game line paint compatible with polyurethane systems (e.g., Bona CourtLines, Sherwin-Williams Gym Line Paint). _ Allow lines to dry completely before topcoating. Finish Coats to Floor and Bleachers- Protective Polyurethane _ Apply two finish coats of high-durability, slip-resistant gymnasium floor polyurethane. Options: o Oil-Modified Polyurethane (e.g., Bona SuperSport, Poloplaz Magnum) - traditional, amber tone, durable. _ Lightly screen/buff between coats to ensure adhesion. _ Maintain manufacturer's minimum cure times (typically 12-24 hours between coats, 72 hours before light foot traffic, and 7 days for full cure). Final Inspection and Cleanup _ Inspect for uniform finish, proper line sharpness, and smoothness. _ Remove protective coverings, reinstall equipment, and clean area. _ Provide owner with maintenance guidelines (daily dust mopping, annual screening/recoating, no tape adhesives on floor). All finishes should meet MFMA (Maple Flooring Manufacturers Association) standards for athletic floors. _ Slip resistance: Final finish must comply with ASTM D2047 / ANSI A326.3 standards, ensuring safe play. _ Cure time must be respected before resuming athletic activity to avoid marking or finish failure. B. Flooring Modification - Ceramic Tile Section _ Removal o Remove approximately 4' x 60' section of existing wood flooring as directed by the School Inspector or designee. _ Subfloor Preparation o Ensure proper leveling procedures are followed so that the tile surface meets the height of the adjacent wood flooring. _ Tile Installation o Furnish and install commercial-grade ceramic tile, non-slip. o Install using thin-set mortar method with proper expansion joints. o Grout using high-performance, stain-resistant grout suitable for school environments. _ GLUE- Roberts 5900 Ceramic Tile Adhesive or similar _ GROUT-Mapei Ultracolor Plus FA Grout _ Tile - Ivy Hill Forge Emerald Matte Large-Format Porcelain (24_12"), non-slip finish. _ Transition o Provide a clean, flush transition between ceramic tile and refinished wood flooring.

Sub-Bidding

Educational

$30,000.00

Public - City

Remodeling

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
915
Active Projects
489
Bidding Soon
7,077
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 15, 2025

January 14, 2026

Project location map

1443 Thomaston Ave, Waterbury, CT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.