Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 18, 2025 at 7:00 PM
Updated December 19, 2025
Site work for a water / sewer project in Waterbury, Connecticut. Working plans call for site work for a water / sewer project.
Clarification Deadline01/05/2025 2:00 PM - ANSWERS WILL BE POSTED BY 2PM ON January 7, 2025. All questions, requests for clarification and communications about this RFP and submission requirements must be submitted through the City of Waterbury ProcureWare website and must be received by 2:00 PM December 5, 2025. Addenda responding to questions submitted by the above date or identified at any Information Session to be held in regard to this RFP, along with any changes or amendments to this RFP, will be available via the City of Waterbury ProcureWare website by 2:00 PM on December 9, 2025. 1. Scope of Work Summary. This project will upgrade a portion of the existing drainage system that connects Lincoln Street to Waterville Street that runs through Bella Vista Condominiums via a 10' drainage easement. There will be approximately 130' of 24" pipe installed and 5 new drainage structures constructed. Also, a new EZ-Block retaining wall will be constructed to support the existing failing stone wall on Waterville Street. A portion of the existing driveway will be repaved and new curbing will be installed. Modified riprap will be installed on the slope and grass will be established on disturbed areas. All work will be performed per the attached construction plans and specifications. During construction, the contractor will be responsible to maintain the stability of the existing stone wall and general safety of the area. It is anticipated that the Successful Proposer shall reach Substantial Completion of the Work on or before May 15, 2026 and shall reach Final Completion of all Work and Services required by this RFP on or before June 1, 2026. (25% of the total state-funded value with DAS-certified Small Businesses and 6.25% of the total state-funded value with DAScertified Minority-, and/or Disabled-owned Business.). The contractor must demonstrate good faith effort to meet the 25% set-aside goals.
Final Planning
Water / Sewer
$250,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 14, 2026
May 15, 2026
318 Waterville St, Waterbury, CT
Related To This Project
Waterbury, CT
Bid Date: Dec 03 2025
Waterbury, CT
Bid Date: Dec 18 2025
Waterbury, CT
Bid Date: Dec 16 2025
Waterbury, CT
Bid Date: Dec 15 2025
Waterbury, CT
Bid Date: Dec 10 2025
Waterbury, CT
Bid Date: Jan 09 2026
Waterbury, CT
Bid Date: Dec 19 2025
Waterbury, CT
Bid Date: Dec 11 2025
Waterbury, CT
Bid Date: Nov 25 2025
Waterbury, CT
Bid Date: Dec 03 2025
Waterbury, CT
Bid Date: Dec 03 2025
Waterbury, CT
Bid Date: Nov 12 2025
Waterbury, CT
Bid Date: Nov 20 2025
Waterbury, CT
Bid Date: Nov 21 2025
Waterbury, CT
Bid Date: Nov 19 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
