BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 21, 2025 at 7:00 PM

Updated November 22, 2025

Site work for a water / sewer project in Milwaukee, Wisconsin. Completed plans call for site work for a one-story above grade water / sewer project.

The work consists of cleaning, Closed Circuit Television Video (CCTV) inspection, and rehabilitation of a force main at the Jones Island Water Reclamation Facility. The force main includes approximately 801 linear feet of 72-inch reinforced concrete pressure pipe (RCPP), 177 linear feet of 72 to 78-inch steel pipe, a 72-inch butterfly valve, and 222 linear feet of 78-inch RCPP, with a total length of approximately 1,200 linear feet. Cleaning and CCTV inspection are required prior to rehabilitation. The RCPP segments require spot repair at five locations, which involves surface preparation, abrasive or centrifugal wheel blasting, repair with repair mortar, and recoating with a high-build epoxy-based liner. The steel pipe segment and butterfly valve must be cleaned and prepared for coating using abrasive or centrifugal wheel blasting and recoated with a high-build epoxy-based liner. The contractor is responsible for supplying all equipment and major power required for the work.

GC Bidding

Water / Sewer

$2,000,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
324
Active Projects
145
Bidding Soon
2,132
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2026

February 28, 2026

Project location map

To Be Determined, Milwaukee, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.