BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 7, 2026 at 7:00 PM

Updated January 8, 2026

Site work and new construction of a municipal facility in Bismarck, North Dakota. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.

**As of December 29, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Construction of scale house and truck scales. Est. Value Notes: $1,652,000.00-$1,927,000.00 ** online bid open link : https://teams.microsoft.com/dl/launcher/launcher.htmlurl=%2F_%23%2Fl%2Fmeetup-join%2F19%3Ameeting_ODZhZGRjZTMtY2Y0NS00ZTM2LTlmNDUtNGEyNmEwMTk0NDVh%40thread.v2%2F0%3Fcontext%3D%257b%2522Tid%2522%253a%25220f3e66fb-f305-4269-858f-4b8a82929a44%2522%252c%2522Oid%2522%253a%2522188bda6e-5108-4ac8-9a04-33751a48f069%2522%257d%26anon%3Dtrue&type=meetup-join&deeplinkId=39f3e962-7be1-48f7-a648-7616347ab663&directDl=true&msLaunch=true&enableMobilePage=true&suppressPrompt=true *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The bid bond should be 5%. All questions and requests for clarifications must be submitted to Karli Frohling in writing no later than 5:00 p.m. on November 19th, 2025. The Project includes constructing the Work broadly described below, in accordance with the Contract Documents, with all related appurtenances. Work shown on the Drawings, or indicated in the Specifications, or indicated elsewhere in the Contract Documents is part of the Work, regardless of whether indicated below. The Work includes, but is not limited to, the following: 1. Permitting activities include, but are not limited to: a. Building b. Demolition c. Utility Service d. Construction Stormwater Management e. Rights of Way f. Sign 2. Demolition of existing scale house without interruption to Owner's operations. 3. Site earthwork including clearing, grubbing, and removal of unsuitable fill. 4. Installation and management of temporary erosion control measures. 5. Installation of permanent erosion control measures. 6. Installation of utilities including natural gas, electrical, fiber optic, water, sanitary sewer, and storm sewer. 7. Construction of a new scale house. 8. Coordination of delegated design elements and installation of two new truck scales with automated technology per Contract Documents. 9. Construction of new access roads for traffic routing and queuing. Bid Results : Contract No. 1 - General Construction Missouri River Contracting Inc $1,867,755.00 Contract No. 3 - Electrical Construction Edling Electric $273,800.00

Award

Municipal

$2,180,825.00

Public - City

New Construction, Site Work

82

30

57

5

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
16
Bidding Soon
198
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2025

February 2, 2026

Project location map

2111 N 52nd St, Bismarck, ND


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.